Laserfiche WebLink
On the No►tb Sbo►e of <br />Lake Minnetonka <br />ON -SITE SEWAGE TREATMENT <br />INSPECTION REPORT POST OFFICE BOX 66 <br />1335 S. Brown Rd. <br />Crystal Bay, MN 55323 <br />473-7357 <br />OWNER 0 +�'^ Z f q k— ADDRESS NM 5 1*✓ _ <br />PERMIT NO.'S. S;3rV DATES 11 g`77 CONTRACTORS S1//1Arr_' <br />City Ordinance No. 210 requires that each on -site sewage treatment system in Grano be inspected on a regular basis. The on -site sewage <br />treatment system at the above address has been inspected and appears to fall into the category checked below. <br />IThis is I& on existing system ❑ new construction) <br />191 Mesh or exceeds current City standards in MI respects relating to deign, construction, and location. Appeas to be operating <br />properly. <br />El 2 Don not meet ell current City standards for new cortstrurr~on 11978 Code) but in most respects appears to be designed, <br />located, and constructed generally in accordance with presto_, codes. System appom to be functioning properly; no manor <br />upgrading of the system is required at this limn. <br />03 Don not most current City standards in many respects relating to design, construction, or location. Appears to be operating <br />s49qustsly of this tip", a e: a relatively high potential for future problems. No major upgrading of system is required at <br />mis nee. <br />04 System may not most eurreiht City standards for design, construction or location., but is failing to properly treat and <br />dispose of the current input, and is endangering a water supply, or is a source of pollution to surface at groundwater%, or is <br />creating a safety hazard, of is otherwise creating a public nuisance. Plasm contact the City Inspector to discuss system repair/ <br />replacement procedures. If drainfield eplacomant is necessary, soil testing will usually be required, end a design and site plan <br />must be submitted for review. Your contractor must obtain a permit before work is started. <br />SYSTEM CONDITION I (Z Chocked items may require your action) <br />Tank impaction indicates: <br />❑ Pumpout not needed at this time. <br />❑ SWA accumulation in tanks indicates they should be pump- <br />ed out this you to help prevent future problems. <br />❑ Betide accumulation in tanks is at a critical love. Tanks <br />should be pumped out as soon n possible. <br />❑ System is discharging to surface. Tanks must be pumped <br />within 48 hours to eliminate sudsce discharge. <br />Inspection risers missing —tanks could not be inspected. <br />I tion risers 114" die. pipe) must be installed in each tank <br />ext <br />last three Vows, they should be pumped out now. <br />SITE CHARACTERISTICS: <br />Limiting Site Factors <br />❑ Slope <br />❑ Soil <br />❑ High water table <br />❑ Lot sets <br />❑ Lake, wetland, or stream <br />❑ Drainage <br />❑ Inspection pipe is located directly ova tank baffle. (Don not <br />give accurate measurement of solids accumulation.) If tanks <br />have not been pumped out within the Is" three yam, they <br />should be pumped out now. <br />Or field inspection indicates: <br />UGrainfield is dry, no surfacing evident. <br />❑ Soma evidence of surfacing, not critical vat. <br />❑ Dreinfield is saturated and risibly discharging untreated <br />effluent to the surface. This condition may require replace- <br />ment or additions to droinfield. Contact the City Inspector <br />immediately. Repairs must been Voted within 90 drys. <br />❑ Grainfield extent and condition unknown. <br />Potential for System Failure <br />(depends on soil types, water <br />table and system condition) <br />Low <br />Medium <br />❑ High <br />❑ System is causing visible <br />Site Cwpebilities for <br />Future Expansion <br />* Adequate <br />❑ Fair <br />❑ Poor <br />❑ Inadequate <br />Note. In the event that this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, be advised that <br />this report don not guarantee or certify that an existing system will con nue to function properly, but is merely an opinion of the adequacy <br />of the system under current conditions based on the available information. <br />This report must br kept on the premises with system location and pumping records. <br />WHITE COPY / Inspector's File GOLD COPY / Homeowner <br />