My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1977-05-19 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
F
>
Farview Lane
>
3083 Farview Lane - 04-117-23-33-0005
>
Septic
>
1977-05-19 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2025 10:33:36 AM
Creation date
12/31/2025 10:20:42 AM
Metadata
Fields
Template:
x Address Old
House Number
3083
Street Name
Farview
Street Type
Lane
Address
3083 Farview Lane
PIN
0411723330005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
An Expansion of Soil Engineering Services, Inc <br />ANNEAPOIIS/ST. PAUL 6600 S. County Rd.16, P.O. Boa 35100, Mpis., Mn. 5$435 / 612.941.5600 <br />ORTHERN MINNESOTA 3210 E. 19th Avenue, Hibbing. Mn. 55746 / 216-263.6669 <br />june 9, 1977 <br />Nitz, Inc. <br />1989 Faegerness °oint Road <br />Wayzata, Minne d 55391 <br />G._ntlemen: <br />Hmult <br />ENGINEERING TESTING <br />s aeapwr t. Arar.a►nr <br />r w .wotltsow. V,n <br />c G U. I. E Vi Ara E,rrrr ,m <br />Re: 77-159 $ 77- .99 <br />Proposed Drainfield System <br />Lot 3, Block 1 $ Lot 4, Block <br />Farview Addition <br />Orono, Minnesota <br />As requested, please ad copies of the proposed drainfield <br />systems for the above mentioned lots. The systems were set <br />up based on the results of the recent percolation tests and <br />in accordance with the "Code of Minimum Standards" as set <br />forth for individual sewage disposal systems for the Village <br />of Orono. <br />The Village of Orono recommends •t each single family <br />residence shall be equipped wit.. o septic tanks, the first <br />of which shall not be less than 750 gallon capacity and the <br />second tank not less than 500 gal�on capacity. If garbage <br />disposal units are used, the first tank shall be of 1000 <br />gallon capacity. The location of the disposal drainfield <br />shall be in an unobstructed and preferably unshaded area and <br />shall be placed no less than 10 feet from.occupied buildings. <br />property lines, or buried p-pe, distributing water under <br />pressure and 75 feet from any water supply well or buried <br />water suction pipe. Disposal trenches shall have a depth of <br />24 inches and not j exceed 36 inches. Trench width shall <br />be 30 inches and with 7 feet center to center minimum <br />spading of lines. <br />Lot 3, Block 1: The disposal system designed for Lot 3, <br />Block ylerTs residence) was set up based on the results <br />of percolation tests P-5 through 1'-8, which indicated an <br />average of 22 minutes per inch (mpi). For this system, a <br />total of 220 li:.-al feet of absorptive trench per bedroom is <br />then necessary. Based on a 3-bedroom home, a total of 660 <br />lineal feet of absorptive trench was then utilized in the 7 <br />design of the system. In order to n.eet the minimum require- <br />ments, the design system consists of 5 trenches, S5 feet in <br />CONSULTING ENGINEERS/SOILS AND MAIERIALS <br />Test Elonngs • Foundation Engmeennq and Recommer—axons a Inspection o; Construction • Material Testing of Smis. Concrete and Building I ompenents <br />
The URL can be used to link to this page
Your browser does not support the video tag.