Laserfiche WebLink
'1 <br />M <br />l Bonestroo, Rosene, Anderlik & Associates, Inc. <br />2335 W. Trunk Highwdy 36 <br />St. Paul, MN 55113 <br />612.636-4600 <br />April 16, 1986 <br />City of Orono <br />Box 66 <br />Crystal Bay, MN 55323 <br />Attn: Ms. Jeanne Mabusth <br />Re: File No. 139-1018 <br />William Ulrich <br />Dear Jeanne, <br />O <br />Engineers & Architects <br />unu r. A~....... P.L <br />NuMr1 W Rwrnr. 1. 1. <br />Jo,rph C Andr,ld, L' 1, <br />HraJ/urd A I r,dwjr. P I <br />N', Aard £ ra,nrr. P L <br />Jomn f 06un. P I <br />61'nn R CWA, P £ <br />A,.rh A (ru,.N.n, I• L <br />1 In--L N.".. Pf. <br />Nu AarJ N' I wlo, P. F <br />t—'. L..8n ,a. P I <br />1; nald C Rmla,dr. P £. <br />Jrrir A P.L. <br />Ma,(. A Ilr,uun, P.L. <br />rrd A' 14d. P I <br />W. hwl l N....... n. P I <br />1 —d 0 1 m l u,r. P f <br />1 hums/ H Prrmun, 1' L <br />.tint hrrl ( L r n, A P L <br />A..,m L. M d/u, P 1. <br />J.-el R. We'd. P F <br />Arn.oh P AaAr,w . Pf. <br />A.:IA A S., hu,arrn, P L <br />.AlarA N Nn11, P L. <br />H, &,r C N.wA. A I <br />rAurn. .'.n�rt, P I. <br />1, 111. tutor. Pl. <br />( hwks AL'. Awn <br />1ru .W Pr.r60 <br />Ila14r .N M." <br />%.WA .A/. LMr1,n <br />We i,ave reviewed the current site grading plan to determine what elevations <br />have been changed from the original grading plan. We have also reviewed the <br />basement elevation relative to the original contours. '"he original site grad- <br />ing Man indicated a basement floor elevation of 933.4. The attached site <br />plan (Figure I) indicates various depths between original ground and the base- <br />ment floor. Area I required an excavation of 4 to 7 feet. Area II required <br />an excavation of 7 to 10 feet and Area III required an excavation of 10 to 17 <br />feet. The developer has proposed to outlet the footing drain to the lagoon <br />area. We would not see this as a problem if properly constructed. <br />The current site grading plan directs storm water runoff from the east 1/3 of <br />the lot south and east to the lake. This plan directs the runoff through a <br />pond which should improve the water quality prior to entering the lake. The <br />original site grading plan directed all storm water runoff webs to the boat <br />lagoon on the pt./perty and then into Crystal Bay. We feel the revised site <br />plan is an improvement to the overall urainage plan for the area. <br />The current site grading plan proposes changes from the original site plan in <br />three primary areas as shown on Figure II, Area I would be south of the home <br />and has become an option because of the lot line rearrangement. Area II con- <br />sists of a proposed berm south of the driveway near Bohns Point Road. Area <br />III consists of a berm north of the driveway near Bohns Point Road. <br />The changes proposed in Area I are beneficial as a level area on the lot would <br />be provided to improve groundwater percolation, fill above original ground in <br />this area would range from 0 to 8 feet. Area It would consist of a berm and <br />plantings to screen the property from the road. We recommend that no filling <br />be allowed on City right-of-way and that no slope exceed 3:1 unless retained. <br />4516d <br />Page 1. <br />30 Year <br />Anniversary <br />