My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 1404
Orono
>
Resolutions
>
Resolution 0001-7547
>
Reso 1400 - 1499 (August 9, 1982 - July 11, 1983)
>
Resolution 1404
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2015 10:42:31 AM
Creation date
11/17/2015 10:42:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
�. • ., <br /> d Clt� o� ORONO <br /> • . <br /> Q� RESOLUTION OF THE CITY COUNCIL . <br /> � NO. 4/� <br /> � _ � � ) "Park" improvements including grading, sodding <br /> or� seeding, trees or other landscaping and <br /> playground equipment, all to be done in accordance <br /> with plans approved by the City Park Commission <br /> and Public Works Coordinator. <br /> 3) Gas, electric and telephone utility services, <br /> . all of which shall be underground. <br /> 4) Any si�dewalk, pathway or landscaping improvements <br /> as may be proposed by the applicant. <br /> • 5) Any street lighting improvements as may be proposed <br /> by the applicant, subject to the design approval <br /> of the City Engineer and Public Works Coordinator. <br /> 6) A timetable establishing completion deadlines for <br /> . all applicant-installed improvements, especially <br /> those improv.ements such as grading and utility <br /> installation that directly affect the proposed ' <br /> • public improvement project. ' <br /> b) PETITION FOR PUBLIC IMPROVEMENTS. The e�ecuted <br /> Developer's_ Agreement shall.� include a formal petition <br /> by the applicant for the City to install the following <br /> improvements as a public project,' the costs of which <br /> will thereafter be assessed against the Schlee property: <br /> , 1) Internal streets, except rough grading, to be . <br /> 30 ft wide. face to face with surmountable concrete <br /> curb and gutter, paved to 5-ton speci£ications. <br /> 2) Blaine Avenue widening and repaving from Crystal � <br /> Place to County Road 15, including Lyric Avenue <br /> � extension to the east property line of the Schlee <br /> property, including easements . <br /> 3) Sanitary sewer trunk line construction from the <br /> intersection of Blaine Avenue and Lyric Avenue <br /> to lift station #5 on Togo Road, including <br /> easements. <br /> 4) Internal sanitary sewer lines and service stubs. <br /> 5) 6"� internal watermain and service stubs, including <br /> a loop connection to Blaine Avenue at both <br /> • Livingston and Lyric Avenues, plus a future . <br /> connection to the west under Livingston Avenue. <br /> Hydrants to be located and installed according <br /> to fire depa�tment recommendations. <br /> PaQe 10 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.