Additional <br />permits required: <br />Plumbing <br />Mechanical <br />Electrical <br />Sewer <br />Retaining Wall <br />Stamped and <br />approved plans <br />must be on site <br />for the duration <br />of the project <br />and all <br />inspections. <br />Reviewed for <br />Code Compliance <br />Nicole Egan <br />RPS23-000053 <br />6-12-23 <br />To schedule <br />inspections call <br />952-249-4613 <br />Have permit number <br />and street address <br />ready at time of call. <br />Please plan accordingly. The City will not issue a <br />Temporary Certificate of Occupancy (Temp CO) <br />for new homes during the growing season from <br />May 1st to November 1st. Issuance of a <br />Certificate of Occupancy requires all permits <br />associated with the project to be finaled and an <br />as-built survey approved by the City. If vegetation <br />is not fully established at the time of CO issuance, <br />the erosion control escrow will continue to be held.