Laserfiche WebLink
Zoning File #935 <br />Wayzata Country Club <br />Page 2 of 2 <br />2) Project completed 1985 for which staff recommends after - <br />the -fact approval with no further design information: pond <br />on 5th fairway - not a desig. wetland - 25' x 75' x 5' deep <br />- slopes ok - 350 cubic yards excavated. <br />3) Projects completed or underway in 1986 which were <br />approved by Council 1-27-86 and for which a grading permit <br />haF ready been issued: <br />j) Rebuild bunkers on hole #8; approximately 1000 <br />cubic yards of fill, all on high ground. <br />b) Extend tee #17; approximately 370 cubic yards of <br />fill, all on high ground. <br />4) Projects to be reviewed under application #1012: <br />a) Pond on hole #6 - this is a designated wetland. <br />Prop -sal is to remove 30 years accumulation of silt and <br />debris, leaves, muck, etc. - no plans to widen or to <br />change bank slopes - spoil site is of some concern and <br />will need some protection - staff is requiring a series <br />cf surveyed cross - sections (2 or 3) to show (_xactly <br />what is proposed - Lindblad notes Me ombs Knutson will <br />likely do the survey/design work. <br />b) Pond to be created on hole #12. - this is not a <br />designated wetland - pond is proposed to be <br />approximately 100' diameter, 3-5' d-ep, located <br />adjscent to (but not contiguous with) the pond created <br />in 1981. Prior to that, this entire area was fairway <br />and bunkers (sand trap). Will remove approximately <br />1200 cubic yards of fill. - spoil site not determined - <br />oil provably a Glencoe silty clay loam. This is a <br />b,,rder to a collection area, probably will have little <br />impact on qua:,ity of water leaving watershed, perhaps <br />will ever, increase storage... <br />Based on the above reco- ndations, staff recommends <br />approval of a conditional use pc_, it for items 1 (a-d), 2 and 3 <br />(a-b', per the attached resolution, which requires that the proper <br />building permit (for the shelter) and the proper grading permit. <br />(for each subsequent year's projects) be obtained prior to <br />commencement of construction. We anticipate that application <br />#1012 for work in the 2 ponds will be presented to the Plarning <br />Commission for initial review in May or June. <br />2 <br />