|
'rAB,..E C
<br />FUTURE FLOW SUMMARY
<br />FUTURE AVEkAGE DAILY
<br />FUTURE PEAK
<br />HOURLY
<br />FUTURE PEAK
<br />INSTANTANEOUS
<br />WASTEWATER
<br />FLOW_(] pd)
<br />WASTEWATER FLOW (gpd)
<br />WASTEWATER
<br />LOCATION
<br />AREA FLOW
<br />SUMMATION
<br />AREA FLOW
<br />SUMMATION
<br />AREA FLOW
<br />SUMMATION
<br />Area
<br />1
<br />114,000
<br />114,000
<br />465,000
<br />465,000
<br />540,000
<br />540,000
<br />Area
<br />2
<br />283,000
<br />397,000
<br />1,155,000
<br />1,620,000
<br />1,339,000
<br />1,879,000
<br />Area
<br />3
<br />33,000
<br />430,000
<br />135,000
<br />1,755,000
<br />157,000
<br />2,036,000
<br />Area
<br />4
<br />269,000
<br />699,000
<br />1,098,000
<br />2,853,000
<br />1,275,000
<br />3,311,000
<br />Area
<br />5
<br />96,000
<br />795,000
<br />391,000
<br />3,244,000
<br />453,000
<br />3,764,000
<br />Area
<br />6
<br />161000
<br />811,000
<br />66,000
<br />3,310,000
<br />76,000
<br />3,840,000
<br />TOTAL
<br />811,000 gpd
<br />3,310,000 gpd
<br />3,840,000 gpd
<br />3652d
<br />
|