My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
100 Big Island - 23-117-23-21-0001
>
Land Use
>
87-1122, CUP
>
Project packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 1:23:21 PM
Creation date
12/23/2025 1:13:04 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHASE V <br />A. New Construction: <br />1. Caretaker cabin (winterized). <br />2. Staff cabins (winterized). <br />3. Minter water supply. <br />4. Campground area toilet/shower building. <br />B. Continue land improvements: <br />1. Site grading and landscaping. <br />2. Increased handicapped accessibility to site. <br />3. Construct tenting pzds. <br />C. Provide: <br />1. Paid tent camping. <br />2. limited paid cabins (temporary cabins). <br />3. Food service. <br />4. Summer facility usage. <br />5. Establish year-round caretaker. <br />D. Plan development of Area 1. <br />E, Develop state-wide marketing campaign. <br />F. Continue assessment of: <br />1. Site use. <br />2 Marketiro <br />3. orogrra.- g. <br />4. Funding. <br />5. Future needs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.