My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
100 Big Island - 23-117-23-21-0001
>
Land Use
>
88-1277, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 1:06:34 PM
Creation date
12/23/2025 1:00:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Control of the number of the visitors to the facility. How will <br />the caretaker/manager control the number of daily visitors. A maximum <br />number should be established based on limit of the septic facilities and RS <br />district standards. <br />7. Fencing may be required along the high steep cliffs. How do you <br />Flan to address staffs and possible Planning Commission concern for the <br />protection of the public who use the facility. Staff may suggest 3 1/2' <br />high cyclone fencing and appropriate signage. <br />8. Septic needs shall be per table set forth in the State Health <br />Departin...i': Regulations 4630.0900. Dependent site shall be determined by <br />the numL-er of picnic tables proposed and agreed upon number for possible <br />boat picnicers and others who picnic on grass areas - final determinant <br />shall be the control number established by the camp based on item 6 above. <br />Peanut Row and the South Hill facility have been confirmed as acceptable by <br />Michael Gaffron for the season. Prior to opening the camp to the public <br />the Hennepin County Enviromental Group must make there appropraite <br />inspection of the lavatory facilities. Staff would like an update on this <br />for the June 6th meeting. <br />9. As Michael Gaffron has noted in his letter to you, the septic <br />system serving the caretaker unit must be replaced by mid July. Staff <br />would recommend July 15, 1988 as deadline date. <br />4 <br />1 <br />J <br />
The URL can be used to link to this page
Your browser does not support the video tag.