My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
100 Big Island - 23-117-23-21-0001
>
Land Use
>
89-1385, CUP
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2025 12:58:33 PM
Creation date
12/23/2025 12:54:40 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1988 Annual Report <br />for the fiscal year ended <br />30 September 1988 <br />In accordance with the provision of Minnesota Statute Chapter 197, the fol- <br />lowing annual report is submitted concerning the activities of the Big Island <br />Veterans Camp Board of Governors. <br />Summary <br />Extensive demolition, clean-n and renovation activities resulted in the Camp <br />being re -opened for day camping by veter,ns in July. Planninq and fund rais- <br />ing fe.- reconstruction of facilities and buildings is well under wall and re- <br />lations with the City of Orono have improved dramaically. <br />1988 Accomplishments <br />1. Camp Re -opening <br />The Camp was re -opened for day camping on July 10, 1988. The re-dedi- <br />cition ceremony was attended by over 209 people and included a flag rais- <br />ing by Charles Lindberg, the sole remaining Iwo Jima flag raising veteran. <br />The re -opening was the culmination of an intensive clean-up and renovation <br />activity that brought the Camp into conformance with Orono requirements <br />and removed all hazardous buildings and conditions. (See attached news <br />article) <br />2. Demolition and Clean-up <br />A total of 32 of the 43 buildings on the Camp property were demolished <br />and completely buried, burned or hauled away. All 32 building:, were be- <br />yond economical repair and were considered to be hazardous by the City of <br />Orono and the Board. The remaining 11 buildings were renovated to approved <br />standards or secured completely pending renovation. In addition, over 200 <br />yards of debris were t,-ucked across the ice to dumpsters during March. Berg <br />Nall was buried on -site and extensive clean-up of aeadfalls and stumps was <br />accomplished. <br />
The URL can be used to link to this page
Your browser does not support the video tag.