Laserfiche WebLink
Task # 19 y Z o <br />Date ailed in <br />Daf Scheduled <br />_ <br />City Of Orono <br />Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form <br />Owner Information <br />Name, <br />KV �Vmo <br />Mailing Address: <br />(if different from <br />Property) <br />1 t <br />Phone: <br />) <br />Email: <br />U- <br />Ins actor information'' <br />Name: <br />Company/ Organization <br />UEY o rono <br />Hi view Plumbing <br />License number: <br />Phone: <br />952-249.46861612-916=1695 <br />Email: <br />Ins ction <br />System <br />Standard <br />Pass <br />Fail <br />Roof Drains <br />Roof drains and leaders Roof drains should not be connected to the sanitary <br />sewer but should discharge to the ground outside of a building. If the roof <br />drains are connected to the sanitary sewer, disconnect them, plug any open <br />connections to the sanitary sewer using a non -shrink permanent material, and <br />redirect the roof drains onto the ground outside the building. <br />Foundation <br />Foundation drains are underground pipes that collect storm water from <br />/ <br />Drains <br />around the base of a building and into a sump basket, where it is then <br />v/ <br />pumped outside of the building. Foundation drains should not he connected <br />to the sanitary sewer. <br />Sump Pumps <br />Sump pumps are designed to capture surface or ground water that enters <br />basements or crawl spaces and pump it away from the house. The basic sump <br />system includes drain tile, a sump pit, a sump pump, a float or switch, and a <br />drain line. Sump pumps should not be connected to tliesanitaEy sewer. <br />Sewer Service <br />Sanitary Sewer Inflow & Infiltration (JIl) Compliance Inspection Sanitary <br />Line <br />Sewer Lines. All sanitary sewer lines serving Property, from the house to the <br />main line, shall be in a safe and functional condition and shall be free from all <br />leaks, failures including but not limited to partially collapsed sections or tree <br />root intrusion. The sanitary sewer lines shall meet the Cite Code standards and <br />specifications. (Details on flack ofthis sheet <br />Notes: <br />Toilet Removed <br />o Yes o <br />For Inspection. <br />City <br />Ins actors <br />Si ature: <br />Date: <br />Owners Signature: <br />Date: <br />Review <br />Com liant <br />CI Corrective Action Re uired <br />Certificate of Compliance Expires. I to .Zb <br />Corrective Action Due by: <br />Date: <br />Signature ., <br />Name: <br />