My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3405 Crystal Bay Road - Point Of Sale Inspection - Compliant
Orono
>
Property Files
>
Street Address
>
C
>
Crystal Bay Road
>
3405 Crystal Bay Road - 17-117-23-44-0022
>
Point of Sale
>
3405 Crystal Bay Road - Point Of Sale Inspection - Compliant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2025 2:58:42 AM
Creation date
12/19/2025 3:37:54 PM
Metadata
Fields
Template:
Address
Street Name
Crystal Bay Road
House Number
3405
Address
3405 Crystal Bay Road
PIN
17-117-23-44-0022
Address Doc Type
Point of Sale Inspection - Compliant
Section
Point of Sale
Retention Effective Date
11/3/2025
Retention
After
Protection
Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task # 98759 <br />Date Called in <br />Date Scheduled 10-9-25 <br />City Of Orono Rescheduled 11-3-25 <br />Point of Sale Sanitary Sewer Service I&I Compliance Inspection Form <br />Property Address: <br />3405 <br />Crystal Bay Road <br />PID: <br />1711723440022 <br />Owner Information <br />Name: <br />Catherine Sweet <br />Mailing Address: <br />(if different from <br />Property) <br />5016 92nd Crescent <br />Brooklyn Park, MN 55443 <br />Phone: <br />612-210-7995 <br />Email: <br />sandraluesse321@gmail.com <br />Ins ector Information <br />Name: <br />Company/ Organization <br />1 o rono <br />Highview Plumbing <br />License number: <br />Phone: <br />952-2494686 1612.916.1685 <br />Email: <br />Inspection <br />System <br />Standard <br />Pass <br />Fail <br />Roof Drains <br />Roof drains and leaders Roof drains should not be connected to the sanitary <br />sewer but should discharge to the ground outside of a building. If the roof <br />drains are connected to the sanitary sewer, disconnect them, plug any open <br />connections to the sanitary sewer using a non -shrink permanent material, and <br />redirect the roof drains onto the ground outside the building, <br />Foundation <br />Foundation drains are underground pipes that collect storm water from <br />Drains <br />around the base of a building and into a sump basket, where it is then <br />pumped outside of the building. Foundation drains should not be connected <br />VVO <br />to the sanitary sewer. <br />Sump Pumps <br />Sump pumps are designed to capture surface or ground water that enters <br />basements or crawl spaces and pump it away from the house. The basic sump <br />system includes drain tile, a sump pit, a sump pump, a float or switch, and a <br />drain line. Sump pumps should not be connected to the sanitary sewer. <br />Sewer Service <br />Sanitary Sewer Inflow & Infiltration (1/I) Compliance Inspection Sanitary <br />Line <br />Sewer Lines. All sanitary sewer lines serving Property, from the house to the <br />main line, shall be in a safe and functional condition and shall be free from all <br />leaks, failures including but not limited to partially collapsed sections or tree <br />root intrusion. The sanitary sewer lines shall meet the City Code standards and <br />specifications. Details on back of this sheet <br />Notes: <br />Replaced 20" of 4" Sch 40 PVC. strong back femco on the 4" PVC to Cast <br />Toilet Removed <br />o Yes o No <br />For Ins ection: <br />Inspectors Signature: <br />Date: <br />Owners Signature: <br />Date: <br />City Review <br />Com liant ❑ Corrective Action Re uired <br />Certificate of Compliance Expires a 1 Correc ive Action Due by: <br />Date: <br />11 3 aG 2 J� <br />Signature: <br />Name: kole,i e <br />
The URL can be used to link to this page
Your browser does not support the video tag.