My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project Packet
Orono
>
Property Files
>
Street Address
>
B
>
Big Island
>
210 Big Island - PID: 23-117-23-23-0034
>
Land Use
>
07-3323, VAR
>
Project Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2025 2:48:31 PM
Creation date
12/18/2025 2:46:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date Application Received: 9/19/07 <br />Date Application Complete: 9/19/07 <br />120 day-Review Period Expiration: 1/17 /08 <br />Department Approval: <br />Name: Evelyn Turner <br />Title: City Planner <br />Item Description: <br />REQUEST FOR COUNCIL ACTION <br />Administrator Approval: <br />Date: November 26, 2007 <br />Item No. <br />Agenda Section: <br />#07-3323 Structures Unlimited, Inc. on behalf of Judson and Aleya Champlin, 210 Big Island <br />-Lakeshore Setback, Hardcover and Foundation Type Variances <br />Zoning District: RS ( 5 acres) <br />Lot Area: 1.02 acres <br />Lot Width: 196 feet <br />List of Exhibits: <br />A-PC Action Notice dated October 16, 2007 <br />B -PC Memo & Exhibits of October 15, 2007 <br />C-PC Minutes of October 15, 2007 <br />D -Memo from Alan Olson, City Planner to Planning Commission dated November 10, 1982 <br />E Survey with revised grading plan and rain gardens, submitted November 5, 2007 <br />F -Revised House Plans, submitted November 5, 2007 <br />G -Photographs with captions, submitted by Applicant November 5, 2007 <br />Application Summary: The applicant requests lakeshore setback and hardcover variances to <br />construct an addition to the rear of the existing seasonal dwelling as well as add a second story to it. A <br />foundation type variance is requested to allow the addition to be constructed on post footings rather <br />than a perimeter foundation. (The retaining wall portion of this application was approved on <br />November 13, 2007. This portion was delayed because the owners were out of the Country.) <br />Planning Commission Recommendation <br />On October 15, 2007, Planning Commission voted 6 to Oto recommend approval of the variances <br />subject to: <br />1. The pitch of the roof being reduced to 10:12. Rather than reduce roof pitch the Applicant has <br />reduced the height of the side walls the 10 inches. This is the same amount the reduction in <br />roof pitch would have reduced the peak height. The Applicant also increased the roof <br />overhang to two feet, which lowered the height of the eave line slightly. <br />2. A landscaping plan for screening being submitted for Staff review prior to the City Council <br />meeting. The applicant revised the grading plan to add rain gardens to catch roof drainage. <br />Shrubs are proposed along the front of the cabin. Staff thought it best to not submit the <br />revised grading plan to the City Engineer for review or ask for a detailed planting plan until <br />direction had been received from Council regarding the variances.
The URL can be used to link to this page
Your browser does not support the video tag.