My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-10-1986 Council Packet
Orono
>
City Council
>
1986
>
02-10-1986 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2025 10:15:14 AM
Creation date
12/18/2025 10:12:33 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i FEB - 4 I February <br />Gruno 'ayor and Couric i ^��iiUA)i" (j <br />Crystal bay, _ <br />Re The Crystal !-,ay Sewer 1 i oject - Ut: jections & Quet Lions <br />1. We ot4ect to the SAC notice of increase from S4?5 to 5475 effective <br />January 10 1986. This notice was received just two (2) days before it <br />wes to Co into effect. We should have been notified WUL I:: AJVA!XE of <br />the increase date to make preparation for payment. Was this an oversight, <br />intentional or just one more action to antagonize the property owners in <br />the area? <br />orject to the -ea.l estate tax statement with the assessment plus <br />interests i;e were prepared to pa;;the entire amount for the project to <br />avoid interest payments, tut o;ere not informed of exact amount, date it <br />could be paid nor IF we could pay it. When we inquired as to this, we <br />were told it should have been paid by November 1l� to av-)id the inrereat <br />charge. It was our understanding that the project way. to be comr,leted <br />before payme.-t was due --and the project is not completed to date. We <br />were not give, option of parent bafora the interest was applied. Could <br />it be that the City advances pay,Ment to contractor hefore completion? <br />j. Lhis nrojest wos to ha•*e started in "arch or April but was not begun <br />until late August. We havi had to (1) take laundry out, (2) reW�ve <br />water softener and iron fi ter to alleviate pumping 5'1� gallons of waste <br />into septic syste.-cer. -.g.e water softener service and (4,` have the <br />tanxs punpea several timer, - =, t � 75. per pump; thie plus rPt.ir int; the <br />softener tnd filter, nayin._, ti,e service c- i the inconvenience of taxing <br />the laundry out. <br />4. How much of the interest chargE: is for the months thrc we could not <br />use the syste:- - if we nad been atle to connect? As it standep we cannot <br />connect until the f;round thaws in the spring. <br />;. Why were ail t!:e trees r oved fror neighborhood at ArCor/Lakeview <br />to :';illov !r' reFlace,..e-t wil'. there be? <br />6. ':her: car we erect the Ltrects to to repaired to their original <br />conditior.5 <br />Quite frrr.,.1y, wc, alone with many otters, are puzzled by the action of <br />our ad: ir.istrative offlel.,-lc a!,d t,elieve that an immediate extlaratior. <br />sho•_:ld ce f:,rthco...i.n t . <br />':haautice;; <br />:�andt er, <br />:anus_ t.. :;andgren <br />121` Artor 5trect, <br />
The URL can be used to link to this page
Your browser does not support the video tag.