Laserfiche WebLink
CITY OF ORONO <br />1986 BID TABULATIONS FOR STREET MATERIALS i EQUIPMENT RENTAT, <br />ALL QUANTITIES ARE BID IN TONS --EQUIPMENT IS BID PER HOURLY RATE <br />BACEHOE d":RHOE RACXHOE <br />PER HOUR PEt HOUR PF' HOUR <br />CY RATE CY RATE CY RATE <br />-------------------------.._--_____------___..____------__--------__-------___---___--_______--____ <br />Schoening Excavating 1/ 48.00 3/4 60.00 <br />e <br />Volkenant 6 Sons 1/3 45.00 <br />TRAXCAVATOR TRAXCAVATOR <br />PER HOUR PER HOUR <br />CY RATE CY RATE <br />-----------------------------------------------------------------------------------_-------------. <br />Schoening Excavating 2 45.00 <br />• <br />Volkenant a Sons 1 1/2 45.00 <br />* DENOTES LOW BID <br />