My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-08-09 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
F
>
Farview Lane
>
3060 Farview Lane - 04-117-23-34-0014
>
Septic
>
1993-08-09 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2025 9:23:29 AM
Creation date
12/17/2025 4:21:49 PM
Metadata
Fields
Template:
x Address Old
House Number
3060
Street Name
Farview
Street Type
Lane
Address
3060 Farview Lane
PIN
0411723340014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUND DESIGN WORKSHEET <br />(For Flows up to 1200 gpd) <br />A. FL01I" <br />Estimated :r^r gpd (see pages D-7 or I-3, 4, 5) <br />or measured — gpd x 1.5 = --- <br />B. SEPTIC TANK LIQUID VOLUMES <br />gallons (see pages C-3 or C-5) <br />C. SOILS (refer to site evaluation) <br />1. Depth to restricting layer = = inches <br />2. Depth of percolation tests = ,' — inches <br />�. Percolation rate a ? . mpi <br />Land slope a % <br />D. ROCK LAYER DIMENSIONS <br />1- Multiply flow rate by 0.83 to obtain required area of rock <br />layer: Daily Flow x 0.83 = <br />( c(o gpd x 0.83 sq. ft./gpd so. ft.-4 is 15L+I <br />2. Select width of rock layer (10 feet or less) _ / G ft. <br />3. Length of rock layer = Area + Width = <br />5 Lt , sq. ft. + ft. _ ft. <br />E. ROCK VOLUME <br />I. Multiply rock area by rock depth to get cubic feet of rock; <br />c� SC fl. x �� ft. = ,-^-i cu. ft. <br />2. Divide cu. ft. bt .>.7 cu. ft./cu. yd. to get cubic yards; <br />CU. ft. + 27 = ' I cu. yd. <br />F. <br />1 <br />2 <br />3. <br />3. Multiply cubic yards by 1.4 to get weight of rock in tons; <br />cu. yd. x 1.4 ton/cu. yd. = ;. tons. <br />ADSORPTION WIDTH - L /- _ + , <br />Percolation rate in top 12 inches of soil is mpi <br />Select allowable soil loading rate from table on page E-; <br />'- gpd/ft2 <br />Calculate adsorption width ratio by dividing rock layer <br />loading rate of 1.20 gpd/ft2 by allowable soil loading rate; <br />1.20gpd/ ft2+ , gpd/ft2= <br />Check this value on paSt, E-16. <br />Multiply adsorption width ratio by rock layer width to get <br />required adsorption width; <br />x _ft=- ft <br />Estimated Sewage Flows in Gallons pta dry <br />(gpd) <br />Nurribc <br />Of <br />Type 1 <br />Type tl <br />Type III <br />Typc <br />Iledroorns <br />I y. <br />2 <br />300 <br />225 <br />180 <br />3 <br />450 <br />300 <br />219 <br />W% <br />4 <br />5 <br />600 <br />750 <br />375 <br />450 <br />256 <br />294 <br />d'kr <br />-W.. <br />6 <br />900 <br />525 <br />332 <br />lr a1. <br />1lut <br />7 <br />1050 <br />600 <br />370 <br />R <br />1200 <br />675 <br />408 I <br />ono <br />Sgtk Tomb Cap of e, iw a•Ibw. <br />N-umbsat <br />Kn,rnw I.,qud <br />I.,gttdc•p."yriN <br />tldn>om/ <br />Capacdy <br />swbW dup- <br />2 a k•• <br />750 <br />1125 <br />3w4 <br />109) <br />Ism <br />4 a 6 <br />IS110 <br />2230 <br />7, 9 at 9 <br />20[al <br />71Rat <br />a•ar 9 <br />...... <br />Rock Bed <br />r�•irrrrrrrrrrrr <br />\•\ \ \•\•\•\•\ \•\ \ ti•�•%.% <br />\,\•\•�s i•r•r•r•r•r.r.r•r.r•r <br />•r•r•r•r�r~r�r�r•r•r.•r•:tir~ftir 1 <br />Length --� <br />Absorption Width Sizing Table <br />Paro►s0on hate <br />m MtnWes ptr <br />Inch IMP I) <br />Soil Testurt <br />Gallons <br />per day per <br />sy-arc fuM <br />Ratio of <br />Atw m moon width <br />k, Rock L.yrr <br />Wrhh <br />PaVtt than 0 1 • <br />Course Sad <br />- <br />... . <br />0.1 10 5 <br />Ssrtd <br />1 20 <br />1 Oil <br />0 1 10 5 •• <br />Fine Sand •• <br />0 60 <br />2 W <br />6 10 15 <br />Sandy Learn <br />0.79 <br />1.52 <br />16 b 10 <br />Loarn <br />060 <br />2 IN) <br />31 to 43 <br />Silt Lam0 <br />2X1 <br />46 to 60 <br />Clay Loan <br />: D 45 <br />2 67 <br />60 to 121) <br />Clay <br />024 <br />5 tt0 <br />Slower than <br />Clay <br />..... <br />120••• <br />
The URL can be used to link to this page
Your browser does not support the video tag.