My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-08-09 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
F
>
Farview Lane
>
3060 Farview Lane - 04-117-23-34-0014
>
Septic
>
1993-08-09 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2025 9:23:29 AM
Creation date
12/17/2025 4:21:49 PM
Metadata
Fields
Template:
x Address Old
House Number
3060
Street Name
Farview
Street Type
Lane
Address
3060 Farview Lane
PIN
0411723340014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-P TESTING, INC. <br />Mary Jane Evans <br />3060 Farview Lane <br />Orono, Henn. Co., MN <br />Steven B. Schirmers — MPCA Cert. No. 627 <br />951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br />August 9, 1'")3 <br />This On -Site Sewage Treatment System is Designed for a Type 1, four <br />bedroom home in accordance with the Minnesota Pollution Control <br />Agency Chapter 7080 and local ordinances. <br />This site has an existing non -conforming system due to the 'bottom of <br />the treatment area being less than 3' from the hig'Zest known water <br />table, mottled soil. The existing tanks may be used upon approval <br />by the local Inspector. <br />The soils at a depth of 12" have a percolation rat? averaging <br />23.7 min inch. <br />A pumping chamber w;.:l need to be installed to lift the effluent <br />to the treatment area. <br />The manifold and supply line pipe must have back drainage to the pumping <br />chamber. The distribution pipes shall have their ends capped. Be sure <br />the rock and sand fill material are clean. The sod layer below the <br />entire mounded area must be turned over, just break up the sod, be sure <br />not to over l.,ork . <br />The power supply and switches must be located outside the manhole and <br />pumpLi,q chamber in a weather proof enclosure. A warning device must <br />be installed with a light ani sound device, this is in case of a pump <br />failure. Mercury floats are a good method. <br />All neighboring wells are located greater than 75' away from the <br />proposed treatment area. <br />Keep all heavy equipment off of the proposed treatment area before and <br />after construction. The treatment area should be marked off before <br />construction. This Desiqn is not valid & the System will need to <br />be relocated if failure to protect the areas proposed for On -Site <br />Sewage Treatment occurs. <br />CONT'D <br />
The URL can be used to link to this page
Your browser does not support the video tag.