Laserfiche WebLink
On the Nnrtb Shore of <br />Lake .Minnetonka <br />ON -SITE SEWAGE TREATMENT <br />INSPECTION REPORT POST OFFICE BOX 66 <br />1335 S. Brown Rd. <br />Crystal Bay, MN 55323 <br />4I3-7357 <br />ra"I'262 Zr' <br />ADDkiL <br />t<_, 1 L DATES 1� � �� CONTRACTORS I >AAVLI —A � �O►Ic� <br />C ry '- ,.sence No. 210 requires that each on -site owega treatment system in Orono be inspected on a regular basis. The on -site sewage <br />bNt"wt system at the above address has been inspected and appears to fall into the category checked below. <br />(This is ® an existing system ❑ new construction) <br />�I 1 Meets or exceeds current City standerds in all respects relating to design, construction, and location. Appears to be operating <br />2 Dan not meet all current City standards for new construction (1978 Code) but in most respects appears to be designed, <br />loculbd, and constructed generally in accordance with previous coda. System appears to be functioning properly; no major <br />upgrading of the system is required at this time. <br />3 Does not meet current City standards in many respects relating to design, construction, or location. Appears to be operating <br />adequately at this time, but ha a relatively high potential for future problems. No major upgrading of system is required at <br />this time. <br />4 System may or may not most current City standards for design, construction or location, but is failing to properly treat and <br />dispose of the current input, and is endangering a water supply, or is a source of pollution to surface or groundwater%, or is <br />creating a safety haled, or is otherwise creating a public nuisance. Planes contact the City Inspector to discuss system repair/ <br />rerlecement procedures. If drainfield replacement is necessary, soil testing will usually be required, and a design and site plan <br />must be submitted for review. Your contractor must obtain a pormit before work is started. <br />SYSTEM CONDITION.( 2 Checked items may require your action) <br />Tank inspection indicates: <br />a Pumpout not nMdad at this time. <br />❑ Solids accumulation in tanks indicates they should be pump <br />ad out Otis yew to help prevent future problems. <br />❑ Solids accumulation in tanks is at a critical level. Tanks <br />should he pumped out as soots as possible. <br />❑ System is dise'r"ng to surface. Tanks must be pumped <br />within 48 hnurs to suminste surface discharge. <br />❑ Inspection rises missing —tanks could not be inspected. <br />Inspection risen 14" die. pipe) must ta; -noshed in each tank <br />at next pu mpout. If tanks hays not been pumµ.' ^art within <br />the lost three yaws, they should be pumped out now. <br />SITE CHARACTERISTICS <br />Limiting Site Factors <br />❑ Slope <br />❑ Soil <br />❑ High water tide <br />❑ Lot sire <br />❑ Lake, wetland, or stream <br />❑ Drainage <br />COMMENTS <br />❑ Inspection pipe is located directly over tank baffle. (Does not <br />give accurate measurement of solids accumulation.) If tanks <br />have not basin pumped out within the last three yaws, they <br />should be pumped out now. <br />Orainfiald inspection indicates: <br />® Drainfield is dry, no surfacing evident. <br />❑ Soma widens of surfacing, not critical yet. <br />O Drainfield is saturated and visibly discharging untreated <br />effluent to the surface. This condition may require replace- <br />msint or additions to d►alnfield. Contact the City Inspector <br />immediately. Repairs must be completed within 90 days. <br />❑ Ormrifield extent and condition unknown. <br />Potential for System Failure <br />Site Capabilities for <br />(depends on soil types, water <br />Future Expension <br />table, and system condition) <br />15 Adequate <br />® Low <br />❑ Fair <br />❑ Medium <br />❑ Poor <br />❑ High <br />❑ Inadequate <br />❑ System is causing visible <br />surface discharge <br />Date of Inspection `Septic System Inspector <br />Note In the event that this inspect»n report is used to satisfv the requirements for a mortgage or other transfer of property, be advised that <br />this report does not guarantee or certify that on existing system will continue to function properly, but is merely an opinion el the adequacy <br />of the system under current condrtrnns based on the available information. <br />This report must be kept can the premises with system location and pumping records <br />WHITE COPY / Inspector's File GOLD COPY / Homeowner <br />