My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1980-08-20 Resident Letter, Timetable for Septic System
Orono
>
Property Files
>
Street Address
>
F
>
Farview Lane
>
3059 Farview Lane - 04-117-23-33-0008
>
Septic
>
1980-08-20 Resident Letter, Timetable for Septic System
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 12:14:47 PM
Creation date
12/17/2025 12:05:09 PM
Metadata
Fields
Template:
x Address Old
House Number
3059
Street Name
Fairview
Street Type
Lane
Address
3059 Fairview Lane
PIN
0411723330008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ir <br />3M FARVIEW LANE <br />LONG LAKE, <br />PHONE (SI t760<41 <br />waaisrtwaD `� <br />•VII DER <br />.*t <br />1Zi <br />f ref j ,•: l:::.:� <br />August 20, 1980 <br />C17_Y OF CRONO <br />Mr. Michael Gaffron <br />City of Orono <br />PO Box 66 <br />Crystal Bay, Minnesota 55323 <br />Michael: <br />Please pardon the discharge problem from the septic <br />tank which you witnessed last Friday. The tanks have <br />been pumped out several times the past couple months <br />and they were supposes to be pumped last Thursday <br />but for some reason the job didn't get done. The <br />tanks, however, have been completely pumped since then <br />by Elmer Peterson. <br />I thought that you had been made aware of the situation <br />by Doug Keller. But in case there is any misunderstand- <br />ing, let me set the record straight: Westonka Sewer <br />!� <br />is goinq to complete the drainfield in early September <br />'i`' <br />after several small trees are removed from the drain - <br />field area and transplanted along the driveway. This <br />u10r;1a11N�uwE„ uX , <br />work was scheduled to be completed last spring, however <br />schedul'nq problems, equipment failure, and the weather <br />prevented a timely and early removal of the trees. The <br />tree mover then said it was getting too late to move <br />them and that I should wait until September first. Then <br />there would be less stress on the trees. As soon as <br />r, <br />that is done then the drainfield will be put in. In <br />the meantime, PeterF-)n has been pumping out the septic <br />tanks. <br />Please accept my apologies for not adequately explaining <br />or having this matter explained to you. The overflow <br />lem will not occur again! <br />W <br />DAN:vlc <br />
The URL can be used to link to this page
Your browser does not support the video tag.