My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1979-06-16 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
F
>
Farview Lane
>
3059 Farview Lane - 04-117-23-33-0008
>
Septic
>
1979-06-16 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 12:14:47 PM
Creation date
12/17/2025 11:59:47 AM
Metadata
Fields
Template:
x Address Old
House Number
3059
Street Name
Fairview
Street Type
Lane
Address
3059 Fairview Lane
PIN
0411723330008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. DISTRIBUTION OF EFFLUENT <br />• 1.. BY GRAVITY FLOW OVER THE SOIL TPEATMENT AREA <br />A. revel Ground <br />Where the elevation difference of the ground surface does not <br />exceed 28 inches in any direction within the soil treatment area, <br />the sewage tank effluent may be directed to the soil treatment <br />area through a distribution box. (See Figure 2). <br />(1) The box shall be watertight with a removable cover and <br />st be constructed of durable materials not subject to <br />ex.. sive corrosion or decay. The minimum inside dimen- <br />sion shall be at least ten inches. <br />(2) The inverts of all outlets shall at the same elevation <br />as measured from a liquid surface, the bottom of the box. <br />(3) The inlet invert s„all be at lei, .ne _ h above the outlet <br />:,nverts . <br />(4) the outlet inverts shall be at least four inches above the <br />distribution box floor. <br />(5) Each drainfield trench line shall be connected separately <br />to the distribution box and shall not be subdivided. <br />When sewage tank effluent delivered to the distribution <br />box by pumo, either a baf--e a -hall be installed in the <br />distribution box or the pump di arge shall be directed <br />against a wail or side of the bu on which there is no <br />outlet. The baffle shall be secured to the box and shall <br />extend at least one inch above the crown of the inlet <br />flow line. <br />B. Sloping Ground <br />Where the elevation difference of the ground surface exceeds <br />28 inches in any direction within soil treatment area a drop box <br />shall be installed at the head end of each lateral line. <br />Connections between drop boxes shall be by watertight pipes. <br />(See Figure 3) <br />(1) The drop box shall be watertight and constructed of durable <br />materials not subject to excessive corrosion or decay. The <br />minimum inside dimension shall be at least ten inches, <br />unless the box is to be used as a valve box. Then each <br />outlet shall have at least eight inches of sidewall space <br />and the side of any outlet shall be e%t least six inches <br />from any corner. <br />U, <br />
The URL can be used to link to this page
Your browser does not support the video tag.