My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1979-06-16 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
F
>
Farview Lane
>
3059 Farview Lane - 04-117-23-33-0008
>
Septic
>
1979-06-16 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 12:14:47 PM
Creation date
12/17/2025 11:59:47 AM
Metadata
Fields
Template:
x Address Old
House Number
3059
Street Name
Fairview
Street Type
Lane
Address
3059 Fairview Lane
PIN
0411723330008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. The inlet and outlet shall be located opposite each other along <br />the axis of maximum dimension. The horizontal distance between <br />® the nearest points of the inlet and outlet devices shall be at <br />least four feet. <br />J. Sanitary tees shall be at least four inches in diameter. Inlet <br />baffles shall be no less than six inches or no more than 12 <br />inches measured from the end of the inlet pipe to the nearest <br />point on the baffle. Outlet baffles shall be six inches meas- <br />ured from beginning of the outlet pipe to the nearest point on <br />the baffle. <br />K. Access to the septic tank shall be as follows: <br />(1) There shall be one or more manholes, at least 20 inch... least <br />dimension, and located within six feet of all walls of the <br />tank. The manhole shall extend through the cover to a point <br />within 12 inches but no closer than six inches below finished <br />grade. The manhole cover shall be covered with at least six <br />inches of earth. <br />(2) There shall be an inspection pipe of at least four inches <br />diameter or a manhole over both the inlet and outlet devices. <br />The inspection pipe shall extend through the cover and be <br />capped flush or above finished grade. A downward projection <br />of the center line of the inspection pipe shall be directly <br />in line with the center line of the inlet or outlet device. <br />iL. Multiple tanks <br />(1) Where more than one tank is used to obtain the required liquid <br />volume, the tanks shall be connected in series. <br />(2) Each tank shall comply with all other provisions of Section 1.A. <br />(3) No more than four tanks in series can b1p used to obtain the <br />required liquid volume. <br />MAINTENANCE SUGGESTIONS <br />Inspect the tank annually and have the tank cleaned when the scum is <br />3 inches cr less above the outlet baffle and/or when the sludge level <br />is 8 inches or less below the outlet baffle. <br />3. LOCATION <br />A. The sewage tank shall be placed so that access is convenient <br />for the removal of liquids and accumulated solids. <br />B. The sewage tank shall be placed on firm and settled soil <br />capable of bearing the weight of the tank and its contents. <br />-5- <br />
The URL can be used to link to this page
Your browser does not support the video tag.