My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-1985 Council Packet
Orono
>
City Council
>
1985
>
12-09-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 11:37:37 AM
Creation date
12/12/2025 11:27:22 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONSTRUCTION PERMITS AND INSPECTION FEES (CONT) <br />Permit Type Fee <br />MUNICIPAL CONNECTION PERMIT <br />Sewer $ 30.00 <br />Water $ 30.00 <br />5/8" meter $ 95.00 <br />3/4" meter $ 130.00 <br />larger meter quote basis <br />Mail -in postage & handling charge (sewer, $ 1.50 <br />water permits only) <br />ON -SITE SYSTEMS <br />Applicable <br />Code Section <br />(Crd. 210) <br />Design Review Fees Included witi• permit fees <br />Subdivision Site Evaluation Report Review $ 30.00/per new lot <br />kesidential System Permit: <br />Replace drainfield or replace 1 or more tank$ 30.00 <br />Replace drainfield & replace 1 or more tanks$ 50.00 <br />New residential system $ 75.00 + $15.00 per <br />inspection over 3 <br />Non -Residential System Permit: <br />New or Total replacement <br />Partial Replacement <br />Outhouse Construction (New or Replacement <br />Big island Only) <br />Annual Service Charge <br />INDIVIDUAL WELLS <br />Installation Permit <br />GRADING, EXCAVATION, FILLING <br />Design Review Fees (;staff only) <br />,ngineer. i ng fees <br />$ 100.00 + $20.00 per insp <br />over 4 <br />$ 60.00 + $20.00 per each <br />inspection over 2 <br />Based on Building Permit <br />Schedule ($38.00 minimum <br />including Plan Review) <br />$ 20.00/system/year <br />plus 10% late penalty for <br />unpaid charges certified <br />(Ord. 221) <br />$ 30.O0 <br />$ 25.00 Minimum <br />1-100 cubic yards ( ex 10 loads) $ 50.00 (staff permit) <br />101 cubic yards or more S 100.00 + Cond. UsQ Permit <br />+ 25-00 per inF;* -tion for <br />each over first inspection <br />NOTE: 101 cubic yards or more requires a Conditional Use Permit unless <br />approved as part of a building per:rit.. <br />SIGNS <br />Temporary 25.00 <br />Permanent (Per 1982 UBC/SBC Standard Schedule) <br />11:1zf� V ; '! 1.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.