My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-09-1985 Council Packet
Orono
>
City Council
>
1985
>
12-09-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2025 11:37:37 AM
Creation date
12/12/2025 11:27:22 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONSTRUCTION PER, iTS AND INSPECTION Fr ES <br />rermit Type <br />BUILDING PERMIT <br />Minimum Fee <br />Normal Fee <br />Plan Review Fee: <br />Commercial <br />Residential <br />Applicable <br />Fc:e Code Section <br />(Ord.216) <br />$ 25.00 <br />(per 1982 UBC/SBC Standard Schedule) <br />(per 1982 UBC/SBC Standard Schedule) <br />50% of Building Permit Fee <br />CERTIFICATE OF OCCUPI&hCY WITHOUT BUILDINC PERMIT $ 30.00 <br />DOCKS - RESIDE6TIAL $ 25.00 <br />DEMOLITION PERMIT <br />Principal Use <br />Accessory Use <br />PLUMBING PERMIT <br />Mail -in postage & handling charge <br />MECHANICAL PERMIT <br />(Ord. 216) <br />$ 30.00 <br />$ 20.JO <br />$ 4.00/fixture <br />$ 25.00 minimum/project <br />$ 1.50 <br />$ 2.00/fixture reset <br />(Ord.216) <br />Minimum Fee for any Mechanical Permit <br />$ <br />25.00 <br />per project <br />Mail -in postage & handling charge <br />$ <br />1.50 <br />Residential, Single Family & Duplt ')y Unit Type <br />- furnace or boiler with flue <br />$ <br />20.00 <br />each unit <br />- wood stove with flue <br />$ <br />30.00 <br />- wood combination or add -on unit <br />$ <br />30.0n <br />- fireplace with flue <br />$ <br />30.0., <br />each unit <br />- central nix conditioning <br />$ <br />20.00 <br />each unit. <br />- exhaust fans (bath, kitchen, attic, etc) <br />$ <br />5.00 <br />each location <br />- solar space heating equipment <br />$ <br />50.00 <br />each system <br />- solar water heaters <br />$ <br />20.0^ <br />each unit <br />- repairs and replacement of the above <br />same as <br />above <br />fine sprinkler systems <br />$ <br />20.00/project <br />- fuel storage <br />$ <br />20.00 <br />permanent <br />$ <br />10.00 <br />temporary <br />Gas Line Inspection High/Low Pressure <br />S <br />30.00 <br />Page 5 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.