Laserfiche WebLink
ON -SITE SEWAGE TREATMENT <br />INSPECTION REPORT <br />On rbf- Norrb Sbore of <br />Lake .M11inerofrka <br />POST OFFICE BOX 66 <br />1335 S. Brown Rd. <br />Crystal Bay, MN 55323 <br />473-7357 <br />OWNER __JWChJ J✓IL!!If------- - --- ADDRESS <br />PERMIT NO.'S. ��' DATES -�1� 7� ---___ _ CONTRACTORS. <br />City Ordinance No. 210 requires that each on -site sewage treatment system in Orono be insoected on a regular basis. The on site sewage <br />treatment system at the above address has been inspected and appears to fall into the category checked below <br />IThis is 0 an existing system ❑ new construction) <br />{� 1 Meets or exceeds current City standards in a11 respects relating to design, construction, and location. Appears to be otserating <br />K� properly. <br />02 Does not meet all current City standards for new construction J78 Code) but in most respects appears to be designed. <br />located, and constructed generally in accordance with previous codes. Svstem appears to be functioning ptoperly: no malor <br />upgrading of the system is required at this time. <br />3 Does not most current City standards in many respects relating to design, construction, or location. Appears to be operating <br />adequately at this time, but has a relatively high potential for future problems. No major upgrading of system is requited at <br />this time. <br />4 System may or may not meet current City standards lot design, construction or location, but is farl rig to prolwily treat and <br />dispose of the current input, and is endangering a water supply, or is a source of pollution to surface or groundwater%, or is <br />creating a safety harard, or is otherwise creating a public nuisance. Please confect the City Inspector to discuss system repair/ <br />replacement procedures. If drainheld replacement is necessary, soil testing will usually be required, and a design and site plan <br />must be submitted for review. Your contractor must obtain a permit before work is started. <br />SYSTEM CONDITION 1 (Z Checked items may require your action) <br />Tank inspection indicates- <br />❑ Pumpout not needed at this time. <br />❑ Solids accumulation in tanks indicates they should be pump• <br />ad out this veer to help prevent future problems. <br />❑ Solids accumulation -n tanks is at a critical level. Tanks <br />should be pumped out as soon as possible. <br />❑ .+ystam is discharging to surface. Tanks rr ust be pumped <br />within 48 hours to eliminate surface dischargi!. <br />❑ Inspection risers miming —tanks could nc t be inspected. <br />Inspection Floors 14" die. pipal must be ins.alled in each tank <br />at next purnpout. If tanks have not been pumped out within <br />the last three yeas, they should be pumped out now. <br />SITE CHARACTERISTICS <br />,) %% Jnspection pipe is located directly over tank battle. (Does not <br />give accurate mawurament of solids accumulation.) If tanks <br />have <br />should n m,—d 0.2 mW <br />Dramfield inspection indicates <br />84 Drainfield is dry, no surfacing evident. <br />❑ Some "dance of surfacing, not critical yet. <br />❑ Drainfield is saturated and visibly discharging untreated <br />effluent to the surface. This condition may require rrajuil <br />ment or additions to drainfield. Contact the City Inspector <br />immediatNy• Repairs must be completed within 90 days. <br />❑ Drainfield extent and condition unknown. <br />Limiting Site Factors <br />❑ Slope <br />Potential for System Failure <br />Site Capabilities for <br />❑ Soil <br />(depends on soil types, water <br />FutFAxdequa, itpan n <br />High water table <br />table. and system condition) <br />❑ Low <br />e <br />Lotsire <br />Medium <br />Fair <br />l Poor <br />❑ Lake, wetland, or stream <br />❑ High <br />Inadequate <br />❑ Drainage <br />C 1 Svstem is causing visible <br />,� y✓ j4 surface. discharge c� <br />COMMENTS �v�5 wire l <br />Dale of Inspection eptic System Inspector <br />Note In the event that this inspection report is used to satisfy the requirements for it mortgage or other tiansfer of property, be advised that <br />this report does not guarantee or certify that an existing system will continue to function properly, but is merely an opinion of the adequacy <br />of the system under current conditions based on the available information <br />This report must be kept on the premises with systern location and pumping records <br />WHITE COPY i Impectot's File GOLD COPY , Homeowner <br />