My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1978-09-14 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
F
>
Farview Lane
>
2935 Farview Lane - 04-117-23-34-0009
>
Septic
>
1978-09-14 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 11:33:22 AM
Creation date
12/11/2025 11:26:44 AM
Metadata
Fields
Template:
x Address Old
House Number
2935
Street Name
Fairview
Street Type
Lane
Address
2935 Fairview Lane
PIN
0411723340009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />III. DISTRIBUTION OF EFFLUENT <br />1. BY GRAVITY FLOW OVER THE SOIL TREATMENT AREA <br />A. Level Ground <br />Where the elevation difference of the ground surface does not <br />exceed 28 inches in any direction within the soil treatmrit area, <br />the sewage tank eff- ant may be directed to the soil tr atment <br />area through a distribution box. <br />(1) ,The box shall be watertight with a removable cover and <br />shall be constructed of durable materials not subject to <br />excessive corrosion or decay. The minimum inside dimen- <br />sion shall be at least ten inches. <br />(2) The inverts of all outlets shall be at the same elevation <br />as measured from a liquid surface in the bottom of the box. <br />(3) The inlet invert shall be at least one inch above the outlet <br />inverts. <br />(4) The outlet inverts shall be at least four inches above the <br />distribution box floor. <br />• (5) Each drainfield trench line shall be connected separately to <br />the distribution box and shall not be subdivided. <br />When sewage tank effluent is delivered to the distribution <br />box by pump, either a baffle wall shall be installed in the <br />distribution box or the pump discharge shall be directed <br />against a wall or side of the box on which there is no out- <br />let. The baffle shall be secured to the box and shall ex- <br />tend at least one inch above the crown of the inlet flow line. <br />B. Sloping Ground <br />Where the elevation difference of the ground surface exceeds <br />28 inches in any direction within soil treatment area a drop box <br />shall be installed at the head end of each lateral line. Connec- <br />tions between drop boxes shall re b_, wa' right pipes. (See <br />Figure 2) <br />(1) The drop box shall be watertight and constructed of durable <br />material- not subject to excessive corrosion or decay. The <br />minimum inside dimension shall be at least ten inches, un- <br />less the box is to be used as a valve box. Then each outlet <br />shall have at least eight inches of sidewall space and the <br />side of any outlet shall be at least six inches from any <br />corner. <br />- 7 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.