Laserfiche WebLink
Zoning File ## 906 <br />November 4, 1985 <br />Page 2 <br />Staff would norm?lly ask that applicants grant utility easements and <br />deed right-of-way for roadways as conditions of met-s and bounds <br />subdivision approval. The permanent sewer easements remain <br />unresolved and the engineer states that the new lot line must be <br />approved before final descriptions for easements can be drafted. Any <br />other issued will be addressed by City with the resolution, of the <br />permanent utility easements. <br />Planning Commission Recommendation - <br />To approve the metes and bounds subdivision of a lot line rearrangement <br />for Shirley McWilliams as proposed based on the following findings: <br />1. The property is served with sewer. <br />2. Each parcel can continue to function as an independent <br />unit. <br />3. To grant a side setback variance for existing accessory <br />structure of 7 feet based on the following findings: <br />1) Utility easement running between both parcels will <br />provide required separation. <br />2) Relocation of structure not feasible br-cause of Sound <br />condition of foundation. <br />The enclosed resolution has been drafted per the Planning Commission's <br />recommendation. <br />