My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-12-1985 Council Packet
Orono
>
City Council
>
1985
>
11-12-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 10:10:29 AM
Creation date
12/11/2025 10:01:19 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project: Sanitary Sewer In1)rovement.a - Crydtul Bay <br />Orono, Minnesota �,- <br />Contractor: A.R.I. Contracting, inc. <br />Kiymettit Nu: 4 <br />File No: 11918 <br />Date: Nov. 4. 1985 <br />STATEMENT OF WORK <br />Unit Est'd Quantity Amount <br />Contract Item unit Pri a (uantity To Date To Date <br />PART II - STREET GRADING SURFACING b <br />RESTORATION <br />- CON'r'11 <br />"Graas paver" concrete grid <br />S.Y. <br />$33.00 <br />.36 <br />Clear and grub trees <br />En. <br />75.00 <br />145 <br />Remove culverts <br />L.F. <br />6.00 <br />120 <br />12" RCP, Class 5, culverts in pl. <br />L.F. <br />15.00 <br />115 <br />Remove and transplant trees <br />Ea. <br />54.00 <br />150 <br />Remove and tran4plant shrubs <br />I..F. <br />8.5U <br />1,200 <br />3" sugar maple, B b B <br />Ea. <br />275.00 <br />15 <br />Colorado green spruce 6'high, B 6 B <br />Ea. <br />180.00 <br />15 <br />Sod with 3" topsoil <br />S.Y. <br />2.30 <br />2,500 <br />Seeding, Cl. 5, w/3" topeo,l, <br />fertilizer 6 mulch <br />Ac. <br />4,600.00 <br />19.0 <br />Siltation erosion control fence, <br />Mirsti "�;nvirafence",or appi.ived equal <br />L.F. <br />2.15 <br />300 <br />Standard 2' a 3' CB <br />v/R-3067 cstg. in pl. <br />er. <br />575.00 <br />2 <br />11" RCP flared end set. ti-o <br />Ea. <br />205.00 <br />4 <br />tip rap <br />C.Y. <br />28.00 <br />10 <br />Filter blanket <br />C.Y. <br />17.50 <br />5 <br />TOTAL PART I - STREFT GRADING, <br />SURFACING:: <br />6 RES'rORATION..... <br />PART I I I - I.I !rT su r i oN <br />CoOstruct wastewater pumping <br />statiou, including precast concrete <br />structure, equipment, piping, site <br />work and electrical work <br />241 <br />60 <br />107 <br />8 <br />318 <br />$18,075.00 <br />360.00 <br />1,605.00 <br />432.00 <br />2,703.00 <br />5.0 23,000.00 <br />38 81.70 <br />2 <br />10 <br />5 <br />L.S. 51.700.00 L.S. 901 <br />TOTAL PART III - L7. t' rTATON..... <br />1,150.00 <br />410.00 <br />280.00 <br />87.50 <br />$106,124.21 <br />$46,530.00 <br />$46,530.00 <br />Page 1. <br />1titi0� <br />
The URL can be used to link to this page
Your browser does not support the video tag.