My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1979-05-08 Septic System Design Report
Orono
>
Property Files
>
Street Address
>
F
>
Farview Lane
>
2820 Farview Lane - 04-117-23-34-0005
>
Septic
>
1979-05-08 Septic System Design Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 8:34:34 AM
Creation date
12/11/2025 8:30:09 AM
Metadata
Fields
Template:
x Address Old
House Number
2820
Street Name
Fairview
Street Type
Lane
Address
2820 Fairview Lane
PIN
0411723340005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W <br />Fg <br />Ful,c <br />SPECIFICATIONS FOR PROPOSED ON -SITE SEWAGE DISPOSAL SYSTEM • <br />SHALLOW TRENCH: DISTRIBUTION THROUGH GRAVITY FLOW <br />C <br />LOCATION: Lot 2, Block 3 of David Nitz subdivision <br />Orono, Minnesota <br />DATE: May 6, 1979 <br />I. SEWAGE TANK - TWO 1000-gallon LIQUID CAPACITY tanks, IN SERIES, <br />manufactured and installed in compliance with the <br />following specifications. See Figure 1 for location. <br />1. MATERIALS <br />A. General <br />All tanks, regardless of material or method of construction shall <br />be: <br />(1) Water tight <br />(2) So designed and constructed as to withstand all lateral earth <br />pressures under saturated soil conditions with the tank empty. <br />(3) So designed and constructed as to withstand a minimum of seven <br />feet of saturated earth cover above the tank top. <br />In addition, the following specif: ions apply to specific mater- <br />ials as indicated. <br />S. Precast Concrete Tanks <br />(1) Precast concrete tanks shall be constructed of at least a <br />40000 psi (pounds per square inch) core test, air entrained <br />concrete mix. <br />(2) Precast concrete tanks shall be cured to at least a seven-day <br />strength before installation. <br />C. Fiberglass and plastic Tanks <br />Fiberglass and plastic tanks shall be designed and constructed to <br />meet the requirements in Section I - a. above. <br />-1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.