My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-01-12 Site Evaluation Report
Orono
>
Property Files
>
Street Address
>
F
>
Farview Lane
>
2811 Farview Lane- 04-117-23-34-0003
>
Land Use
>
1987-01-12 Site Evaluation Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2025 2:05:04 PM
Creation date
12/10/2025 1:44:13 PM
Metadata
Fields
Template:
x Address Old
House Number
2811
Street Name
Fairview
Street Type
Lane
Address
2811 Fairview Lane
PIN
0411723340003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M. David Nitz <br />Page 3 <br />January 12, 1987 <br />If as -built elevations are different from those above, headloss <br />should be recalculated to ensure proper pump selection. <br />The pump should be rigged with mercury float switches to dose about <br />175 gallons of effluent to the mound. An additional mercury float <br />switch should be installed on a separate circuit to an alarm device <br />to warn of failure. The mercury switches should be rigged to allow <br />700 gallons reserve capacity in the pumping chamber. All <br />electrical connections should be watertight. <br />The septic tanks should each have at least 1,000 gallons capacity. <br />The pumping chamber should have at least 1,000 gallons capacity. <br />It is recommended that a water meter be installed to monitor water <br />use. Exterior sillcocks should be excluded from the metered water <br />system. The water meter should be read periodically and water use <br />patterns adjusted if necessary to ensure that the design sewage <br />flow of the septic system is not exceeded. <br />The area for the proposed primary septic system should be roped off <br />to prevent vehicular traffic on the site. Construction of the <br />mound system should begin only when the moisture content of the <br />topsoil is lower than the plastic limit. <br />It is highly recommended that the installer of this septic system <br />holds an Individual Sewage Treatment Systems Certificate for <br />installation issued by the Minnesota Pollution Control Agency. <br />The sole purpose of soils data contained herein is evaluation of <br />soil suitability for on-ait,�t absorption of septic tank effluent at <br />the test site. AlthOlAgh so'_1 texture and horizonation information <br />and groundwater elevation data may be helpful for the setting of <br />basement elevations at this site, we cannot warrant any such inter- <br />pretations or use of this c.ata for other purposes. <br />If you have any questions about information contained in this <br />report, please feel free to contact me. <br />Sincerely, <br />HAKANSON ANDERSON ASSOCIATES, INC. <br />. Aa, " If. ( /" <- - - - - - " <br />Gary J. thbun, Soil Scientist <br />Enclosures <br />File: 1540.07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.