Laserfiche WebLink
BUILDING CODE ADMINISTRATION: <br />Building Permits Based on Value Table <br />Building permit fees (Building, Plumbing, <br />Mechanical, unless otherwise noted) <br />Based on 2024 <br />Building Valuation Table <br />Plan Review Fee 65% of Building Permit Fee <br />Rereview Plan Fee Up to the cost of the Plan <br />Review Fee Based on <br />Building Offical <br />Recommendation <br />Minimum Fee $29.50 <br />Moved-In Structure (not including foundation, <br />interior remodel, etc.)$275.00 <br />Pre-Move Inspection $165.00 <br />Special investigation fee (work started without <br />obtaining a permit – applies even if no permit is <br />pulled) <br />100% of Building permit fee <br />Manufactured Home Installation $275.00 plus <br />State Surcharge and requires a regular building <br />permit if also doing basement, foundation, garage <br />or entryway, fees are based on sq. ft. State Table $275.00 <br />$1,000.00 <br />Valuation based on ICC 2024 Building Valuation <br />tables <br />Total Valuation Fee <br />$1.00 to $500.00 <br />$501.00 to $2,000.00 <br />$2,001.00 to $25,000.00 <br />$25,001.00 to $50,000.00 <br />$50,001.00 to $100,000.00 <br />$100,001.00 to $500,000.00 <br />$500,001.00 to $1,000,000.00 <br />$1,000,001.00 and up <br />State Surcharge as required by State. <br />Demolition <br />Demolition: Principal structure $100.00 <br />Demolition: Accessory structure/Septic system <br />(Per unit fee)$50.00 <br />City Engineer may require an erosion control <br />escrow for projects disturbing soils. <br />Not to Exceed <br />$1,000.00 <br />$6,636.65 for the first $1,000,000.00 plus $4.50 for each additional $1,000.00, or fraction thereof <br />$28 for the first $500.00 plus $3.70 for each additional $100.00, or fraction thereof, to and including <br />$2,000.00 <br />$83.50 for the first $2,000.00 plus $16.55 for each additional $1,000.00, or fraction thereof, to and <br />including $25,000.00 <br />$464.15 for the first $25,000.00 plus $12 for each additional $1,000.00, or fraction thereof, to and <br />including $50,000.00 <br />$764.15 for the first $50,000.00 plus $8.45 for each additional $1,000.00, or fraction thereof, to and <br />including $100,000.00 <br />$1,186.64 for the first $100,000.00 plus $6.75 for each additional $1,000.00, or fraction thereof, to <br />and including $500,000.00 <br />$3,886.65 for the first $500,000.00 plus $5.50 for each additional $1,000.00, or fraction thereof, to <br />and including $1,000,000.00 <br /> Refunds: 80% of building permit fees on projects not yet started (within 90 <br />days of permit issuance by municipality). No refund on plan review fees, state <br />surcharge or maintenance permits <br />$29.50 <br />City Administrator may require an erosion control escrow for projects <br />disturbing soils.