My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord 318 Fee Schedule 2026
Orono
>
Ordinances
>
Ord 318 Fee Schedule 2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:52:18 AM
Creation date
12/9/2025 10:52:11 AM
Metadata
Fields
Template:
Administration
Admin Doc Type
Ordinance
Section
Ordinances
Subject
Fee Schedule 2026
Document Date
12/8/2025
Retention
Permanent After File Date
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Sewer Rate <br /> Single Family Home: <br />Per Connection $75.41 per month <br />Garage Condos ($75.41/month minimum):$7.54/month per unit <br />Plus By flow: $7.54/1,000 gallon plus <br />All Other ($75.41/month minimum): $7.54/month per SAC unit <br />Plus By flow $7.54/1,000 gallon plus <br />Long Lake Service (Metered and/or Unmetered) <br />Minimum Charge (10,000 Gallons or Less Water Usage)$75.41 per Month <br />Plus Over 10,000 Gallons Water Usage, per 1,000 Gallons $7.54/1,000 gallon plus <br />Wayzata Service <br /> Metered Service <br />Minimum Charge (10,000 Gallons or Less Water Usage)$75.41 per Month <br />Plus Over 10,000 Gallons Water Usage, per 1,000 Gallons $7.54/1,000 gallon plus <br /> Unmetered Service <br />Per Property $75.41 per Month <br />Single Family Home: $16.81/month or $50.43/quarter <br />Garage Condo:$16.81/Month/Unit or $50.43/Quarter/Unit <br />All Other:$16.81/month/SAC Unit or $50.43/quarter/SAC Unit <br />$6.96/month or $20.89/quarter Minn. Stat. § 115A.93, subd. 3c <br />Recycling Cart from Waste Management No Charge <br />$100.00 per month <br />Right of Way Permit $150.00/permit <br />Right of Way Escrow (for other than Public Utility) $1,500 <br />New Street Intersections (See zoning section - Special improvement fees) <br />On-Call Service to Other Cities <br /> Base On-Call Fee $70.00/day <br /> Call-Out Fee Actual wage and equipment rates <br />Penalty for late payment of utility bills - 1% monthly if not paid by due date (applied to the total unpaid balance). <br />Interest at 8% on unpaid utility and accounts receivable bills upon certification to the County. <br />Assessment Charge for Unpaid Accounts Certified $30.00 <br />Special Asssesment Certification Fee subject to County rates. <br />OTHER CHARGES <br />SUMP PUMP SURCHARGE <br />RECYCLING CHARGE <br />STORM WATER UTILITY RATES <br />PUBLIC WORKS SUPPLIES & SERVICES <br />The basic intent of storm water regulations is to minimize the impact of development on natural drainage systems. Any development in an area will change the <br />natural conditions by increasing the total volume of runoff and the level of pollutant loading. The storm water utility provides dedicated funds to operate, <br />maintain, manage, construct or reconstruct the municipal storm water drainage system. Residential properties will be charged one residential unit fee for each <br />residential unit on the property. Non-residential properties will be charged the appropriate number of residential unit fees based on the “Residential Equivalent <br />Factor” for the property. <br />Some Properties on Mytlewood and Old Long Lake Road are not connected to water. Wayzata bills Orono based on a quarterly usage of 25,000 gallons. Charge is <br />based on the metered rates and 25,000 gallons. <br />SEWER SERVICE FEES
The URL can be used to link to this page
Your browser does not support the video tag.