My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Development Contract - Honey Hill
Orono
>
Property Files
>
Street Address
>
S
>
Sixth Avenue North
>
3515 Sixth Ave N - 29-118-23-43-0002
>
Resolution
>
Development Contract - Honey Hill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2025 9:43:16 AM
Creation date
12/5/2025 9:42:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
concerning erosion and drainage and any prohibiting grading, construction activity, and the use of power <br />equipment. Developer shall submit to the City plans and specifications that have been prepared by a <br />competent professional engineer licensed in the State of Minnesota, for approval by the City Engineer. <br />Developer shall instruct its engineer to provide adequate field inspection personnel to assure an acceptable <br />level of quality control. In addition, the City may, at the City's discretion and at Developer's expense, <br />have one or more City inspectors and a soil engineer inspect the work as the City may reasonably <br />determine. Developer, its contractors and subcontractors, shall follow all instructions received from the <br />City's inspectors. Developer's engineer shall provide for on -site project management. Developer's <br />engineer is responsible for design changes and contract administration between Developer and <br />Developer's contractor. Developer or its engineer shall schedule a pre -construction meeting at a mutually <br />agreeable time at the City Council chambers with all parties concerned, including the City staff, to review <br />the program for the construction work. Within thirty (30) days after the completion of the Improvements <br />and before the Security is released, Developer shall supply the City with a complete set of reproducible <br />"as constructed" Plans, and an electronic file of the "as constructed" Plans in an auto CAD file based upon <br />the Hennepin County coordinate system, all prepared in accordance with City standards. <br />9. Iron Monuments. In accordance with Minnesota Statutes Section 505.02 and the Orono <br />City Code, the final placement of iron monuments for all lot corners must be completed before the Security <br />is released. Developer's surveyor shall submit a written notice to the City certifying that the monuments <br />have been installed. <br />10. Permits. Related to the Project and Improvements, Developer shall obtain, or require its <br />contractors and subcontractors to obtain, all necessary permits, including but not limited to the following, <br />to the extent required: <br />4 <br />23240205 <br />
The URL can be used to link to this page
Your browser does not support the video tag.