Laserfiche WebLink
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />NO.7490 <br />until the Developer has provided evidence that all required Hennepin County permits have <br />been obtained. <br />B3. The Developer shall address the applicable general engineering comments and/or <br />conditions provided by the City Engineer in a memo dated June 19, 2024, attached hereto <br />as Exhibit C with the final development plan submittal. <br />B4. The development shall adhere to the conditions within the Anderson Engineering <br />Conservation Design Master Plan. <br />B5. The erosion control plan shall adhere to "Best Management Practices for Protecting Water <br />Quality in Urban Areas" and to the approved SWPPP. All erosion controls as required by <br />the City and the MCWD shall be in place prior to commencing grading and excavation on <br />the site. All such erosion control measures shall be maintained in working order until the site <br />is vegetated and stabilized. <br />B6. The construction limits shall be clearly marked with adequate fencing to prevent any <br />construction damage or disturbance of any trees and vegetation outside of the construction <br />limits area. The Developer shall identify trees to be preserved on site, shall mark them on a <br />site plan, and shall take extraordinary measures such as fencing, signage, etc. to ensure <br />they are not disturbed. <br />B7. Upon evidence of resettlement history, the Developer shall cease all activity and contact the <br />City and the Minnesota State Historic Preservation Office (SHPO) before proceeding. <br />B8. Violation of or non-compliance with any of the terms and conditions of this resolution may <br />result in the termination of any authority granted herein. <br />B9. Easements Required. <br />1. Drainage and Utility Easements shall be dedicated to the public on the final plat 10, <br />along all exterior property lines, and 5' on either side of interior property lines, except <br />such easements shall be increased to accommodate drainage where required, <br />subject to City staff approval. <br />2. A Drainage and Utility easement shall be dedicated to the public on the plat over <br />stormwater pond areas, drainageways, and stormwater facilities. <br />3. A Drainage Easement shall be granted over wetlands and wetland buffers on the <br />Property. <br />B10. Development Fees: Stormwater and Drainage Trunk Fee: The property will be subject <br />to the 2024 Stormwater and Drainage Trunk Fee of $8,060.00 per new lot. Three new lots <br />are proposed, therefore $8,060 x 3 = $24,180.00. <br />