My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rec Res 7466
Orono
>
Property Files
>
Street Address
>
W
>
Watertown Road
>
2245 Watertown Road - 34-118-23-33-0056/03-117-23-22-0001/2/21/22
>
Land Use
>
Rec Res 7466
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 1:04:22 PM
Creation date
12/4/2025 1:04:14 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ORONO <br />RESOLUTION OF THE CITY COUNCIL <br />A2. Dedication on the plat of the perimeter Drainage and Utility Easements as required in <br />Resolution 7425, <br />A3. Dedication on the plat of the Drainage Easements as required in Resolution 7425 shall be <br />granted over all wetlands, creeks, and buffers on the Property. <br />A4. Permits Required. <br />a. Grading and Right -of -Way permits are required before construction of the new <br />driveway serving Lot 2. <br />b. MCWD Erosion Control and Stormwater Management permits, if applicable. <br />A5. Before the commencement of any construction, the construction limits shall be marked <br />with adequate fencing to prevent any construction damage or disturbance of any trees and <br />vegetation outside of the construction limits area. The Developer shall identify trees to be <br />preserved on site, shall mark them on a site plan, and shall take extraordinary measures <br />such as fencing, signage, etc. to ensure they are not disturbed. <br />A6. A title opinion for the Property and certified copies of all recorded easements currently <br />affecting the Property shall be submitted. <br />A7. Payment of Development Fees Required: $500 <br />a. Final Plat Application Fee: $550. <br />b. Park Dedication Fee: $0 <br />c. Stormwater and Drainage Trunk Fee: $0 <br />A8. The approvals granted in this Resolution shall become effective only when all conditions of <br />approval requiring actions by the Developers have been satisfied. <br />A9. The City Clerk shall release the plat documents for filing only upon certification by the City <br />Attorney, Community Development Director, and City Engineer that all requirements of the <br />platting regulations have been satisfied. <br />A10. The aforesaid plat shall be filed by the City of Orono with Hennepin County on or before <br />August 14, 2024, together with a certified original copy of this resolution and executed <br />copies of the easements and covenants pertinent thereto. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.