Laserfiche WebLink
MINUTES OF THE PLANNING COMMISSION MEETING 11FLD JULY 15, 1985. PAGE. 4 <br />#852 STANLEY GREGORY 3. Payment of fees for the many inspections to <br />be made by Orono staff during construction period. <br />4. Applicant to hire outside agency to perform <br />water tests per City's monitoring scheJ ule. <br />5. Written confirmation by applicants that FWBI <br />and U.S. Soils Office may perform required tests on <br />site. <br />b) No use of chemic,..L agents in control of algae <br />and aquatic vegetation. In addition the City will <br />ask that al; use of fertilizers, hericides and <br />pesticides i areas adjacent to ponds <br />c) City to approve type of dredging to be employed <br />with wildlife restoration. <br />d) Four agencies must approve the proposed <br />contruction: DNR, MCWD, U.S. Soils Of f ice and <br />FWBI. <br />e) Base Line check to be done to check the <br />discharge currently from the culvert in Browns Bay. <br />Motion, Ayes (4), nays (0). <br />T�927 STANLEY GREGORY <br />41 SHORELINE DRIVE <br />V IANCE <br />SECOND REVIEW Mr. & Mrs. Gregory were present. !-eq Kopischke <br />of Westwood Planning & Engineerinc, was also pre- <br />sent. <br />Zoning Administrator Mabusth noted that there is at <br />least 1200.s.f. of inovative materials, proposed as <br />non -hardcover within the 0-75' setback area. <br />Fopischke has submitted a plan for use of a comb- <br />ination _)f grass and boards as non -hardcover. <br />Since the pool has been moved 5' away from the <br />lakeshore, it does not need approval from the DNR. <br />The closest point of the pool away from the Lake- <br />shore is 53'. <br />Kopischke stated that the deck would be a <br />c:ombinatien decking/boardwalk syste^n - a framed <br />system grid. This same system is int ted through- <br />out the rest of the project. The end effect would <br />a l l ow water movement through it . There would be <br />gr.ivel underneath. <br />