Laserfiche WebLink
Prgject: Sanitary Sewer Improvements- Crystal Bay <br />Orono, Minnesota <br />Contractor: A.R.I. Contracting, Inc. <br />Payment No: 1 <br />File No: 13918 <br />Date: Aug. 5, 1985 <br />STATEMENT <br />OF WORK <br />Unit <br />Est'd <br />Contract Item <br />Unit <br />Price <br />Quantity <br />PART II - STREET GRADING, SURFACING 3 <br />RESTORATION - CONT'D <br />"Grass paver" concrete grid <br />S.Y. <br />$33.00 <br />36 <br />Clear and grub trees <br />Ea. <br />75.00 <br />145 <br />Remove culverts <br />L.F. <br />6.00 <br />120 <br />12" RCP, Class 5, culverts in pl. <br />L.F. <br />15.00 <br />115 <br />Remove and transplant trees <br />Ea. <br />54.00 <br />150 <br />Remove and transplant shrubs <br />L.F. <br />8.50 <br />1,200 <br />3" sugar maple, B b B <br />Ea. <br />275.00 <br />15 <br />Colorado green spruce 6'high, B b B <br />Ea. <br />180.00 <br />15 <br />Sod with 3" topsoil <br />S.Y. <br />2.30 <br />2,500 <br />Seeding, Cl. 5, w/3" topsoil, <br />fertilizer b mulch <br />Ac. <br />4,600.00 <br />10.0 <br />Siltation erosion control fence, <br />Mirafi "Envirafence",or approved equal <br />L.F. <br />2.15 <br />300 <br />Standard 2' x 3' CB <br />w/R-3067 cst- i pl. <br />Ea. <br />575.00 <br />2 <br />12" RCP filar. section <br />Ea. <br />205.00 <br />4 <br />Rip rap <br />C.Y. <br />28.00 <br />10 <br />Filter blanket <br />C.Y. <br />17.50 <br />5 <br />TOTAL PART II - STREET GRADING, SURFACING <br />b RESTORATION..... <br />PART III - LIFT STATION <br />Construct wastewater pumping <br />station, including precast concrete <br />structure, equipment, piping, site <br />work and electrical work <br />L.S. 51,700.00 L.S. <br />TOTAL PART III - LIFT STATON..... <br />Quantity Amount <br />To Date To Date <br />137 <br />$10,275.00 <br />$11,568.00 <br />$0.00 <br />7650c <br />Page 3. <br />