Laserfiche WebLink
2. The silt fence hould be inspected frequently by <br />your staff to e.,sure its integrity. The fence <br />must be functioning properly during the dredging <br />operation to prevent heavy silt loads to Brown's <br />Bay. <br />3. The outlet of the wildlife pond should have a <br />baffle or skimmer to remove debris prior to <br />discharge to Brown's Bay. <br />4. The property owner should be encouraged to avoid <br />the use of fertilizers, herbicides, and pesticides <br />in areas adjacent to the two ponds. <br />I b-ive discussed these comments and recommendations <br />with Mr. ;reg Kopischke of Westwood Planning and Engineering <br />Company. If you have any questions or require additional <br />inf—mation, please let. me know. <br />Sincerely, <br />yi <br />oel C. Settles <br />District Limnologist <br />JS:sj <br />cc: Mr. :opischke <br />