Laserfiche WebLink
May 15, 1985 <br />Ms. Mabusth <br />Page 2 <br />The additional storm water storage along with the sedimentation/ <br />nutrient removal by the pond and filtration along the outlet channel <br />should improve and maintain good water quality just as with the <br />wildlife pond. <br />4. The proposed method of erosion control is a standard silt fence using a <br />sedimentation control fabric (see detail on grading plan). Additional <br />fence backing for the fabric and/or hay bales as a secondary control <br />may also be used where its considered necessary or desirable to <br />maintain proper erosion control throught the entire construction <br />period. <br />5. Scheduling proposes the formal pond area, outlet channel and culvert <br />under the driveway be constructed during the spring and summer of 1985. <br />The skimmer and the improvements and controls in the immediate area of <br />the outlet culvert (from the wildlife pond area) will also be installed <br />at the same time. <br />The wildlife pond will be constructed in the winter of 1985-86. This <br />is due to the physical constraints of construction equipment getting <br />Into the area at any other time and the ability to better control <br />erosion and water quality discharge to Lake Minnetonka. <br />Please feel free to contact me Should v <br />more information. <br />Sincerely, <br />WESTWOOD PLANNING & ENGINFF,RING COMPANY <br />t-net-' `z- e- <br />Greg Kopischke <br />GK/sd <br />cc: Glenn Cool <br />Mr. b Mrs. William Gregory <br />Enclosure: Grading Plan (3 copies) <br />any questions or require <br />