My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-1985 Council Packet
Orono
>
City Council
>
1985
>
07-22-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 11:28:00 AM
Creation date
12/4/2025 11:21:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Zoning File #852 <br />July 19, 1985 <br />Page 4 <br />2. Assimilative Capacity of Each Wetland - discussed above refer to - <br />Nutrient Quality Analysis (Exhibit I). Once again no significant <br />effect. <br />3. Time of Year - Alteration of wildlife pond to be performed in <br />winter of 85/86. Decorative pond, channel, outlet summer of 85'. All <br />of the reviewing bodies approve scheduling. <br />4. Stagnant Water Potential - the flow of drainage or runoff to lake <br />is more controlled with outlet - the maximum depth of both ponds <br />appear to be at 4' +/- - the potential for stagnant water would be <br />lessened with alteration. <br />5. Aigae Control - 50' wide vegetation buffer and skimmer at wildlife <br />pond - formal pond to be aerated - also vegetation in channel will <br />filter drainage to wildlife pond. <br />6. Design Configuration of Alteration - formal pond - 801x80' will <br />have steep side slopes and stabilized by using 12 inches of heavy clay <br />packed against natural soil. Approves: by City Engineer. <br />Wildlife pond - varied 7-1 to 3-1 slopes for wildlife pond approved by <br />DNR. <br />7. Monitoring Procedures - applicants agree to allow qualified agent <br />of City to monitor pond after construction. <br />Staff z,.iggest the following: <br />1. Special fees to cover Orono staff inspection during contrac- <br />tion period. <br />2. Special agreemeDt between owner and City (Developer's Agree- <br />ment) to have an outsiue agency hired to make annual inspections <br />per scheduled approval by City. Please node Dr. Hanson has <br />specifically requested the right to enter property for monitoring <br />purposes. <br />Water Quantity <br />1. Design storm return frequency (100 year). To my knowledge <br />this has not been covered in the review. <br />2. Overflow control device - skimmer has been approved by both <br />MCWD, U.S. Soils Office and City Engineer. <br />3. Watershed characteristics - discussed above. <br />4. Retention time - not addressed in applicant's information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.