My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07-22-1985 Council Packet
Orono
>
City Council
>
1985
>
07-22-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 11:28:00 AM
Creation date
12/4/2025 11:21:24 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C�06!.A MEETING <br />TO: Mayor and City Council JUL 2 71`35 <br />FROM: Mark Bernhardson, City Administrator _ <br />DATE: July 17, 1985 C1'�u Gf ORUNO <br />SUBJECT: Administrator's Information Items <br />130 CYGNET PLACE To date we are unaware of a formal trial date <br />being set alteough it has been indicated that the responses have <br />been received from the defendents. <br />KRUTZIG PROPERTY The Zoning Administrator and City Engineer have <br />been out on the property and have instructed the developer to <br />remove fill that was placed within the 0-75 foot setback and <br />additionally have instructed regarding appropriate swales on <br />either side of the property to handle drainage. This will be in <br />accordance with revised landscaping plans. <br />CRYSTAL BAY ROAD It has been indicated by Mr. Jerry Wheeler that <br />Ala —have the appropriate engineering work done within the <br />next several days and that if we do not feel that such meets our <br />requirements to have a pronouncement that is non -hardcover he <br />will submit a variance request. Additionally we are continuing <br />the review of the sheds, Carl Johnson and Dick Carl properties so <br />that they will know prior to the deadline for the August Planning <br />Commission whether they need to file for a variance. (Please see <br />separate agenda item.) <br />HIGHWAY 12 CORRIDOR STUDY Following a meeting with Mr. Shardlow <br />we :e rai o� ut a tenet ve work schedule which will be presented <br />to you at your meeting on August 12th. Initial items include <br />setting up a kickoff meeting with the Planning Commission and <br />Council at 7:00 P.M. on September 17, 1985 for a brief overview <br />of the projec< Ly Mn Shardlow. Additionally we will be sending <br />out notices regarding the study and the kickoff meeting to all <br />affected property owners. <br />CLIFF OTTEN It has been indicated to Mr. Otten the status <br />iegarding the study. He has indicated that he is no longer <br />looking at the Willow and Hwy 12 sites but is looking at sites at <br />County Road 6 and Willow Drive. <br />2695 CASCO POINT ROAD Progress on the project to date has been <br />meeting the deadlines we established. The drainage system was in <br />this week and it has been ordered that the exterior work be done <br />by August 19, 1985, which is approximately a week beyond 12 <br />months allowed for completion of exterior work. Ad,litionally <br />they have been directed to do all the grading and filling by the <br />first week in September and that interior work be completed by <br />the first week in October. <br />
The URL can be used to link to this page
Your browser does not support the video tag.