Laserfiche WebLink
C <br />COUNPIL VENTING <br />!UL 81�j <br />10- <br />'. <br />To: Mark Bernhardson, City Administrator ��$T�' ��' 4': <br />From: John R. Gerhardson, Public Works Coordinator <br />Date: July 5, 1985 <br />Subject: Intersection Design Change Cost Casco Point Road & Dunwoody <br />At the June 24, 1985 Council meeting, Council directed staff to <br />submit a cost estimate for design change at the intersection of Casco <br />Point Road and Dunwoody Avenue. <br />The following is a breakdown of those costs: <br />Bituminous Curbing 150 feet @ 4.50 = $675.00 <br />Back Fill Behind Curbing = -0- <br />Pulverized Hack Dirt 10 yds. @ 5.00 = 50.00 <br />Grass Seed 3 lbs. @ 2.19 = 6.57 <br />Total Material Cost $731.57 <br />Light Equipment Operator 16 hrs. @ 13.75 = $220.00 <br />Heavy Equipment Operator 8 hrs. @15.28 = 122.24 <br />Laborer 8 hrs. @ 12.08 = 96.64 <br />Total Labor $431.88 <br />Total Material and Labor $1,163.45 <br />