Laserfiche WebLink
ORONO HARDCOVER CALCULATION WORKSHEET <br />#932 <br />C. Existing E. Proposed <br />LAKESHORE A. Existing B. Existing D. Proposed Proposed F. Allowed <br />hardcover hardcover haiJcovehardcover <br />SETBACK lot area hardcover percentage ,. <br />ZONE in zone in zone in zone percentage percentage <br />[ (B;A) x 1001 [ (D:A) x 1001 <br />0-75' <br />75-250' <br />250-500' <br />�3 7�sf C% sf <br />sf sf sf %_ 25 <br />-\,s f sf �' "�o sf i% 30 �o <br />500-1000' (" sf sf <br />(.i sf <br />0 <br />35 <br />i <br />: �� E <br />Directions: 50 aFF •�� <br />A. Existing Lot Area in Zone - includes the total square footage of dry buildable land eA tp <br />within the specified zone. C. <br />B. Existing Hardcover in Zone - includes the square footage of existing roofs, decks, sidewal <br />driveways (gravel or paved) and other rain -impervious surfaces within the specified zone. <br />C. Existing Hardcover Percentage - divide the number in B by the number in A and multiply by 100. <br />D. Proposed Hardcover in zone - includes the existing hardcover plus all proposed additional <br />hardcover. <br />E. Proposed Hardcover Percentages - divide the number in D by the number in A and multiply by 100. <br />F. Allowed Hardcover Percentages - if the percentages in column E for any setback zone exceed <br />the allowed percentages in column F, you should contact the Zoning Department at 473-7357 <br />iscuss the possibilities of obtaining a variance. Generally, if a concurrent removal <br />xisting hardcover matches the additional hardcover proposed, resulting in no net increase <br />.iardcover in a specified zone, a variance may not be necessary. <br />