My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-1985 Council Packet
Orono
>
City Council
>
1985
>
05-28-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 10:34:54 AM
Creation date
12/4/2025 10:24:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pis. Miry Butler, Mayor <br />May 16, 1985 <br />Page 2 <br />The reason for the credit is that the Commission underspent its 1984 budget by <br />5.5%, or approximately $4,650,000.00. The budget was underspent primarily in <br />the areas of contracted services, wages, benefits, materials, supplies, <br />utilities, and chemicals. The Cannission also realized increased revenue from <br />its Industrial Strergth Cderge and Investment Earnings (refer to Attachment C - <br />1984 Fiscal Report). <br />In addition, the total flow discharged to the MDS in 1984 was greater than <br />estimated by nearly 8%. The increased flow is primarily due to annual <br />precipitation of at least 10 inches above normal for both 1983 and 1984. As <br />shown in Attachment D - Annual Commnity Flows, the total metropolitan area <br />wastewater flow varies nearly +7 percent depending upon the amount of <br />precipitation received in the period prior to and during the year of record. <br />This variation in the wastewater flow is primarily the change in the aneunt of <br />inflow/infiltration (I/I) as a percentage of the total wastewater volume. <br />According to our flaw records, it appears that significant I/I flow is present <br />in your sewage collection system. The volume of I/I flow is minimized when <br />sewers are properly installed and an on -going maintenance program is <br />implemented. <br />The Commission has begun the preparation of the "1986 Statement of Sewer <br />Services Charges" for the 104 communities who discharge to the MDS. The <br />initial step in this process is to estimate the wastewater flow that will be <br />generated by each of these communities in 1986. Based on historic flow records, <br />precipitation trends, and your community's anticipated growth (i.e., 50 <br />residential equivalent connections), the Commission has estimated your <br />community's 1986 flaw to be 225 MG. <br />The Commission has also initiated the preparation of its 1986 Budget. The <br />Budget includes the Cammission's operation and maintenance costs plus the user <br />portion of the debt service necessary to fund existing and proposed capital <br />improvement projects. The 1986 Budget, which will be presented for public <br />hearing this summer, is expected to be approximately 68 greater than the <br />Commission's 1985 Budget. In accordance with State Statutes, the budget will be <br />allocated proportionally to the 104 communities who discharge to the MDS, based <br />on their estimated wastewater flaw. <br />The 1985 wastewater flow estimate for your community is 200 MG (refer to <br />Attachment E - Statement of 1985 Sewer Service Charges). This estimate, which <br />was made in mid-1984, includes the 50 new residential equivalent connections <br />(REC's) that are expected to be added to your sewer system during 1985. Based <br />on the metered flow data from the first quarter of 1985, this estimate appears <br />to be slightly low. Should future flow data indicate a major departure from the <br />flow originally estimated, the Cammission will advise you accordingly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.