My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-1985 Council Packet
Orono
>
City Council
>
1985
>
05-28-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 10:34:54 AM
Creation date
12/4/2025 10:24:53 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 9 <br />MEASUREMENT, PAYMENT AND PROJECT ACCEPTANCE <br />9.1 DETAILED BREAKDOWN OF CONTRACT AMOUNT <br />Except in cases where unit prices form the basis for payment under the Con- <br />tract Documents, the Contractor shall, within ten (10) days of receipt of the <br />Contract Documents, submit an itemized breakdown of the Contract Amount having <br />the value, including an allowance for profit and overhead, assigned to each <br />part of the Work. Unless the breakdown of the Contract Amount is objected to <br />by the Owner, it shall be used as the basis for all Requests for Payment. <br />9.2 REQUEST FOR PAYMENT <br />The Contractor may submit periodically, but not more than once each month, a <br />Request for Payment for Work done and materials delivered and stored on the <br />site. Payment for materials stored on the site will be conditioned on the <br />following: <br />(a) The Contractor shall submit evidence to establish the Owner's <br />title to such materials. <br />(b) Acceptable provisions have been made for storage. <br />(c) The Contactor shall provide and maintain insurance against all <br />loss, theft, vandalism, damage and similar peril for the full value of the <br />stored material. The insurance on the stored material shall name the <br />Owner as insured. <br />Each Request for Payment shall be itemized and computed from the Work com- <br />pleted on all items listed on the Detailed Breakdown of Contract Amount. <br />Where unit prices are specified, the Request for Payment shall be based on the <br />quantities completed. The Owner shall pay to the Contractor an amount not to <br />exceed 95% of the amount earned under the Contract subject to the approval <br />outlined in Section 0.3 and the provisions of Section 9.4 and 9.5. However, <br />when the Work required under the Contract is 95% or more completed, upon <br />recommendation of the Engineer, such portions of the retained money shall be <br />releaRed as the Owner determines are not required to be retained to protect <br />the Owner's interest in satisfactory completion of the Contract. <br />9.3 ENGINEER'S ACTION ON A REgUES'r FUR PAYMENT <br />Within ten (10) days of submission of any Request for Payment by the Contrac- <br />tor, the Engineer shall recommend to Owner: <br />(a) Approval of the Request for Payment as submitted; or, <br />(b) Appro-ial of: such other amount as Engineer shall consider is due <br />the Contractor, informing the Contractor in writing of his reasons for <br />recommending approval of the modified amoun , or, <br />1/85 - 8507b <br />Copyright 1995 <br />Bonestroo, Rosene, Anderlâ–ºk <br />b Associates, Tnc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.