Laserfiche WebLink
I <br />r <br />8.10 TESTS AND INSPECTIONS <br />8.10.1 Contractor shall Rive Engineer timely notice of readiness of the Work <br />rfor all required inspections, tests or approval4. <br />8.10.2 If any law, ordinance, rule, regulation, code, or order of any public <br />body having jurisdiction requires any Work (or part thereof) to specifically <br />be inspected, tested, or approved, Contractor shall assume full responsibility <br />therefor, pav all costs in connection therewith and furnish Engineer the re- <br />quired certificates of inspection, testing or approval. Contractor shall also <br />be responsible for and shall pay all costs in connection with any inspection <br />or testing required in connection with Owner's or Engineer's acceptance of a <br />manufacturer, fabricator, supplier or distributor of materials or equipment <br />proposed to be incorporated in the Work, or of materials or equipment submit- <br />ted for approval prior to Contractor's purchase thereof for incorporation in <br />1. the Work. The cost of all other inspections, tests and approvals required by <br />the Contract Documents shall be paid by Owner (rinl.ess otherwise specified). <br />8.10.3 All inspections, tests or approvals other than those required by law, <br />ordinance, rule, regulation, code or order of any public body having jurisdic- <br />tion shall be performed by organizations selected by or acceptable to Owner or <br />Engineer. <br />8.10.4 If any Work that is to be inspected, tested or approved is covered <br />without written concurrence of Engineer, it must, if requested by Engineer, be <br />uncovered for observation. Such uncovering shall be at Contractor's expense <br />unless Contractor has given Engineer timely notice of Contractor's intention <br />p1 to cover such Work and Engineer has not acted with reasonable promptness in <br />response to such notice. <br />Ft. 10.5 Neither observations by Engineer nor inspections, tests or approvals <br />by others shall relieve Contractor from his oblizations to perform the Work in <br />4'• accordance with the Contract Documents. <br />8.11 UNCOVERING WORK <br />If any Work is covered contrary to the written request of Engineer, it must, <br />r, if requested by Engineer, be uncovered for Engineer's observation and replaced <br />at Contractor's expense. If Engineer considers it necessary or advisable that <br />kr <br />covered Work be visually examined by Engineer or inspected or tested by <br />others, Contractor, at Engineer's request, shall .incover, expose or otherwise <br />f <br />make available for observation, inspection or testing as Engineer may require, <br />M that portion of. the Work in question, furnishing all necessary labor, material <br />and equipment. If it is found that such Work is defective. Contractor shall <br />1 bear all the expenses of such uncovering, exposure, observation, inspection <br />p and testing and of satisfactory reconstruction, including compensation for <br />additional profesPional servicpa, and an appropriate deductive Change Order <br />shall he issued. If, howevor, such Work is not found to be defective, Cor- <br />tractor shall be allowed an increase in the Contract Price or an extension of <br />In the Contract Time, or bath, directly attributable to such uncovering, expo - <br />I <br />- 31 - <br />! /85 - 85n5h <br />Copvriuht 148) <br />bonestroo, Roseno, .Anderlik <br />