My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-24-1985 Council Packet
Orono
>
City Council
>
1985
>
06-24-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 10:14:06 AM
Creation date
12/4/2025 10:08:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
M I NUTFS ON THE REGULAR ORONO COUNCIL MEETING HELD JUNE 24, 1985. PAGE 6 <br />#918 NORDSTROM <br />(COFT.) Building b Zoning Administrator Mabusth stated that the the <br />City would have to retain the necessary security to assure <br />the completion of all required improvements. Mabusth noted <br />that Council may wish to establish deadlines for completion <br />of required improvements. <br />Councilmember Frahm moved, CcuncilmemberT. Adams seconded, <br />to approve the preliminary plat application by John <br />Nordstrom finding all standards of the RR-lB Rural <br />Residential Zoning District and on -site septic code have <br />been satisfied subject to the following conditions: <br />1. All new construction and septic installation must meet <br />the City's setbacks from I.ydiard Lake if applied for <br />before the Council adopts the DNR's regulations. If a <br />building permit is applied for after the City adopts the <br />DNR's regulations, the new construction is subject to <br />the DNR's setbacks from Lydiard Lake. <br />2. Describe wetland in angles and bearinqs within Lot 5 at <br />970' elevation. Designate wetland as drainage <br />easement. City to ask for Conservation 6 Flowage <br />Easement over wetlands. <br />3. Private road on Outlot A to be constructed prior to <br />issuance of building permits to Lots 4 or 5 and private <br />driveway on Outlot B must be constructed and existing <br />driveway be dismantled prior to issuance of building <br />permits to Lots I and 2. <br />4. Applicant must provide adequate security and enter into <br />a developer's agreement if the private road and existing <br />driveway removal are not completed prior to final plat <br />approval. Applicant to submit plans of restoration of <br />driveway area prior to alteration for Orono staff <br />approval. Engineering plans for private road must be <br />approved by the Orono staff prior to construction. <br />5. The City will ask for underlying road and utility <br />easements over Outlot A --maintenance covenants for <br />upkeep and maintenance of private road. Applicant must <br />submit proof within private covenants that shared <br />driveway, ownership and maintenance is shared by Lots 1 <br />2 and 3. <br />6. The area of the property involved in Lydiard Lake (below <br />elevation 970' ) must be described in anodes and bearings <br />and designated as drainage easements. The drainage <br />easements are tv be dedicated on the plat for public use. <br />7. Payim-rit of $b()0 park dedication fee ($200/lot !. <br />Motion, Ayf•s; ( `0 , N,jys ( 0) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.