My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-24-1985 Council Packet
Orono
>
City Council
>
1985
>
06-24-1985 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2025 10:14:06 AM
Creation date
12/4/2025 10:08:32 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE REGULAR ORONO COUNCIL. MEETING HELD JUNE 24, 1985. PAGE 3 <br />4913 PAUL PHILL113S Councilmember T. Adams noted that the fins; resolution <br />(CONT.) should place the developer/owner on notice that the drainage <br />tile will be the owner's responsibility to maintain and not <br />the City's responsibility. <br />M..yor Butler questioned the wording on the survey regarding <br />the 100 year high water mark at 1005.5 unless drain tile is not <br />plugged. <br />Surveyor, Mark Gronberg, clarified for the Council the <br />meaning of such wording. Gronberg stated that the <br />calculations were done for. the 100 year storm assuming that <br />the tile would be plugged. Gronberg stated that the <br />calculations show what the worst case would be. <br />Councilmember T. Adams asked Phillips if he has any <br />preliminary plans for the property shown on the survey north <br />of the proposal. <br />Paul Phillips presented sketches of his proposal for the <br />property to the north. <br />Mayor Butler moved, Councilmember Frahm seconded, to <br />recommend approval of the preliminary plat application of <br />Paul Phillips finding all standards of the on -site septic <br />code and the rural standards of the RR-lB zoning district <br />have been satisfied based on the following findings: <br />1. If Lot 1 is to be approved as a buildable site the <br />following conditions and controls must be placed on the <br />future use of the property: <br />A) Septic area of Lot 1 must be safeguarded for future use <br />as there may not be another suitable septic area within <br />the boundaries oi. the lot. At the time the septic system <br />is installed a berm must also be instal led a lung the west <br />side of both the primary and alternate test sites and <br />east of proposed road or if road is constructed first, <br />developer must stake off septic area prior to <br />construction and provide information in road plans as to <br />how drainage will be tarred away from septic area. <br />B) First habitable level of residence structure to be at <br />1007.5 elevation. <br />C) All changes in elevations or grades on L.ot 1 , outside <br />of original building permit review, must be approved by <br />the City. <br />2. Drainage the running thr-ugh Lot-s- 1, 2 and 3 must be <br />designated as 1`, fvet drainage casement. <br />3. Conservation and Flccwayf- Easemcrit to tat• taken over <br />drainayc -en<lint:cr to determine 1,1 :or to f inal <br />1,1it app!ova i! add it1onaI area atcvun,i t1le inlet <br />chcaulJ 1,4. Sn� lt,.i<i1 w,tt,itr cltain.tq+ rarer t rot.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.