Laserfiche WebLink
THESE LIMITATION OF LIABILITY STATEMENTS SHOULD BE <br />CONSIDERED TO BE AN INTEGRAL PART OF THIS REPORT: <br />I. In performing our processional services with regard to earthwork inspection and r,ualHy <br />control, our findings will b, obtained and our recommendations made, in accordance <br />with generelfy accepted e, o;ieering principles and practices. We will ^bserve, monitor <br />and test this worm, and may advise or make recommendations, but we are not guarantors. <br />This warranty is in lieu of all other warranties either expressed or implied. <br />2. Subterranean Engineering does not practice in the field of land surveying, and <br />is not responsible for the accuracy of grade stakes and/or building location stakes at <br />this jobsife. There must be adectuate construction stakes, clearly marked, to enable our <br />soil inspector to properly assess the c•cavatio, . We will not be respo^-;ble for any harm- <br />ful consequences resulting from improp,r or incorrect construction ..eking. <br />3. The field density test data prasentea with this report represents tho valve: at per- <br />ticier "hod points within the earthwork. Alhough this is befievod to be fairfy repre- <br />sentative of the condition of the fill placed and compacted on this date, conditions at <br />other locations and elevations in the fill may vary, and we o not warrant or guarantee <br />uniform fill densities. <br />4. We cannot certify, either ;,xprwly or by imptication, the quality of any work on this <br />project which we did not have the cpportunity to obseree at first hand. Inspection of the <br />earthwork project at irregular intervals does not permit the inspector to assess the feel <br />scope of the contractor's activities. <br />5. If 'he structur_ is redesigned in size and shape, or if it is otherwise moved subsegtwh <br />to cur inspection, we should be notified so that we can assess if additional inspection <br />work is required, or suggest sound engineering alternatives. We are not responsible <br />for any soil -foundation system where the structure has been relocated with respect to <br />excavation and fill area, subsequent to our inspection. <br />