Laserfiche WebLink
THESE LIMITATION OF LIABILITY STATEMEATS SHOULD BE <br />CONSIDERED TO BE AN INTEGRAL PART OF THIS REPORT: <br />I. In performing our professional se vies with regard to earthwork inspection and quality <br />control, our findings will be obtained and our recommendations made, in accordance <br />with generally accepted engineering principles and practices. We will observe, monifor <br />and test this work, and may advise or make recommendations, but we are not guarantors. <br />This warranty is in heu of all other warranties either expresser: or implied. <br />2.Subterranean Engineering does not practice in ;he field of land surveying, and <br />is not responsible for the accuracy of jrads stakes end/or building location stakes of <br />this jobsite. There must be adequate construction stakes, clearly-arked, to enable our <br />ail inspector to property assess the excavation. We will not L. responsible for any harm- <br />ful consequences resulting from improper or incorrect construction staking. <br />3. The field density test data presented with this report represents the values at par. <br />ficla► localized points within the earthwork. Alhough this is believed to be fairfy repro <br />santative of the condition of the fill placed and compacted on this date, condition of <br />other locations and elevations in the fill may vary, and we do not warrant or guarantee <br />uniform fill densities. <br />4. We cannot certify, ei+sr expressly or by implication, the quality of any work on firs <br />project which we did not have the opportunity to oL serve at first hand. Inspection of " <br />earthwork project at irregular intervals does not pormit the inspector to assess the full <br />scope of the contractor's activities. <br />S. If the - -icture is redesigned in size and shape, or if it is otherwise moved subeequent <br />to our inspection, we should be notified so that we can assess if additional inspection <br />work is required, or suggesl sound engineering alternatives. We are not responsibie <br />for any soil -foundation, system where the struct,we has been relocated with respect to <br />excavation and fill area, subsequent to our inspection. <br />k <br />I OCT 17 r�l4 <br />_. <br />til ?0,�� <br />