My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-09-01 Soil Report
Orono
>
Property Files
>
Street Address
>
F
>
Fagerness Point Road
>
1932 Fagerness Point Road - 17-117-23-23-0015
>
Permits/Inspections
>
1984-09-01 Soil Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 10:23:12 AM
Creation date
11/26/2025 8:37:57 AM
Metadata
Fields
Template:
x Address Old
House Number
1932
Street Name
Fagerness Point
Street Type
Road
Address
1932 Fagerness Point Road
PIN
1711723230015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THESE LIMITATION OF LIABILITY STATEMEATS SHOULD BE <br />CONSIDERED TO BE AN INTEGRAL PART OF THIS REPORT: <br />I. In performing our professional se vies with regard to earthwork inspection and quality <br />control, our findings will be obtained and our recommendations made, in accordance <br />with generally accepted engineering principles and practices. We will observe, monifor <br />and test this work, and may advise or make recommendations, but we are not guarantors. <br />This warranty is in heu of all other warranties either expresser: or implied. <br />2.Subterranean Engineering does not practice in ;he field of land surveying, and <br />is not responsible for the accuracy of jrads stakes end/or building location stakes of <br />this jobsite. There must be adequate construction stakes, clearly-arked, to enable our <br />ail inspector to property assess the excavation. We will not L. responsible for any harm- <br />ful consequences resulting from improper or incorrect construction staking. <br />3. The field density test data presented with this report represents the values at par. <br />ficla► localized points within the earthwork. Alhough this is believed to be fairfy repro <br />santative of the condition of the fill placed and compacted on this date, condition of <br />other locations and elevations in the fill may vary, and we do not warrant or guarantee <br />uniform fill densities. <br />4. We cannot certify, ei+sr expressly or by implication, the quality of any work on firs <br />project which we did not have the opportunity to oL serve at first hand. Inspection of " <br />earthwork project at irregular intervals does not pormit the inspector to assess the full <br />scope of the contractor's activities. <br />S. If the - -icture is redesigned in size and shape, or if it is otherwise moved subeequent <br />to our inspection, we should be notified so that we can assess if additional inspection <br />work is required, or suggesl sound engineering alternatives. We are not responsibie <br />for any soil -foundation, system where the struct,we has been relocated with respect to <br />excavation and fill area, subsequent to our inspection. <br />k <br />I OCT 17 r�l4 <br />_. <br />til ?0,�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.