My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-24-2025 - Agenda Packet Cc - Regular Meeting
Orono
>
City Council
>
2025
>
11-24-2025 - Agenda Packet Cc - Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2025 3:29:23 PM
Creation date
11/24/2025 3:12:08 PM
Metadata
Fields
Template:
Administration
Admin Doc Type
Agenda Packet CC
Section
City Council
Subject
Regular Meeting
Document Date
11/24/2025
Retention
After
Protection
Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Date: November 24, 2025 <br />Title: Casco Cove Rehabilitation - Award <br />Presenter: Adam Edwards, City Administrator / Engineer <br />Section: Consent Agenda <br />Item: 9 <br />Purpose: <br />The purpose of the item is to accept a quote for the stormwater improvement at Casco Cove. <br />2. Background: <br />The improvement intends to address flooding potential, adequately convey runoff and improve <br />water quality. The current stormwater infrastructure is insufficient to address localized flooding <br />issues and offers limited to no treatment prior to release into Lake Minnetonka. This project need <br />was identified in the City's Surface Water Management Plan. <br />3. Scope: <br />This project has been broken into two parts. This portion would improve the bioretention basin by <br />removing dead and dying trees and revegetating the area with native wetland plantings. The <br />second part, which will be awarded later, will replace a section of the outlet piping from the basin. <br />4. Cost: <br />The city solicited and received quotes from two contractors. The low quote is from TreeStory, <br />Inc., Inc. for $18,198. <br />Project Costs: <br />Activity <br />Vendor <br />Cost <br />Comments <br />Design and Engineering <br />Bolton & <br />$35 000 <br />Previously Approved - <br />Menk <br />Not to Exceed <br />Construction - Basin <br />TreeStory, <br />$18,198 <br />Restoration <br />Inc. <br />Construction Oversight- <br />Bolton & <br />$ 3,400 <br />Not to Exceed <br />Basin Restoration <br />Menk <br />Construction- Pipe <br />TBD <br />Replacement <br />Construction Oversight- <br />TBD <br />Pipe Replacement <br />Total <br />$56,598 <br />Funding: <br />The project is funded by the Stormwater Fund. The CIP allocated $161,000 for this project. The <br />projected end of year balance for the fund is $645,000. <br />6. Staff Recommendation: <br />I recommend acceptance of the Quote for TreeStory, Inc. This portion of the project is best <br />initiated during the winter months. <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.